All days

UPSC current affairs · Monday

Current Affairs, 30 March 2026

11 issues picked from 76 PIB releases · about 2 minutes each · written by UPSC Grade, each fact checked against its PIB release or by a second model

How to readRead “Why in news” and “What it is” for every issue. Open For Prelims or For Mains for the exam you’re preparing for, then Test yourself at the foot of each card. Half the news questions in Prelims are answered from background, not the news itself.

In 60 seconds

  1. Solid Waste Management Rules, 2026. New solid waste rules replace the 2016 rules from 1 April 2026, with four-stream segregation.
  2. Census 2027. Census 2027 starts 1 April 2026: first digital census, with self-enumeration and caste enumeration in phase two.
  3. Electronics Component Manufacturing Scheme (ECMS). MeitY clears 29 more ECMS proposals; 75 approved in all, Rs 61,671 crore investment.
  4. National Green Hydrogen Mission (SIGHT Mode 2B). SECI-run bidding allocated 7.24 lakh tonnes of green ammonia to fertiliser units under NGHM; agreements exchanged.
  5. Designated Repositories under Biological Diversity Act, 2002. Kochi's Bhavasagara centre becomes India's national repository for deep-sea specimens under the Biological Diversity Act.
  6. Agricultural Credit. Government lists PSL norms, interest subvention and digital portals to expand Kisan Credit Card reach.
  7. Bio-Bitumen from Crop Residue (CSIR). CSIR transfers bio-bitumen technology turning crop residue into road-building material for industry adoption.
  8. National Skills Qualifications Framework (NSQF). MSDE reports NSQF qualification numbers and steps to align skilling with industry demand, in a Lok Sabha reply.
  9. Revamped Distribution Sector Scheme (RDSS). RDSS has sanctioned Rs 2.83 lakh crore; national AT&C losses fell from 21.91% to 15.04%.
  10. Jan Samarth Portal. Jan Samarth, the single portal for 15 credit-linked schemes, has processed 41.14 lakh applications.
  11. Price Support Scheme (PSS) for Pulses and Oilseeds. Centre approves MSP procurement of Rabi pulses and oilseeds under PSS in three states.
1

Law and statutory body

Solid Waste Management Rules, 2026

GS3 EnvironmentGS2 Local governancePrelims and Mains

Why in news
On 30 March 2026, the Environment Ministry told the Lok Sabha that the Solid Waste Management Rules, 2026, notified on 27 January 2026, take effect from 1 April 2026.
What it is
The Solid Waste Management Rules, 2026 are the national rules for municipal solid waste. They replace the SWM Rules, 2016 and cover collection, processing and disposal, including sanitary landfills. Such rules are made under the Environment (Protection) Act, 1986.
Who builds landfills
The local body sets up and runs sanitary landfills through eligible agencies.
District Magistrate role
The District Magistrate must ensure the landfill operates as per the Rules.
Audit and portal
The SPCB or PCC, or a registered environment auditor, audits landfills; the SPCB or PCC uploads the report on a centralised portal.
CPCB direction
CPCB issued its biomining and bioremediation direction under Section 5 of the Environment (Protection) Act, 1986.
Four-stream segregation
Waste must be segregated at source into wet, dry, sanitary and special care waste.
RDF fuel substitution
Industrial units, including cement and waste-to-energy plants, must raise use of Refuse Derived Fuel from 5% to 15% over six years.
Polluter Pays
Environmental compensation is levied on the Polluter Pays principle.
Implementation bodies
Central and State-level Committees are to be set up; the CPCB has constituted the Central Implementation Committee.
Parent law
Rules of this kind are made under the Environment (Protection) Act, 1986.
Four streams
Waste must be segregated at source into wet, dry, sanitary and special care waste.
Bulk Waste Generator
A bulk generator has a floor area of 20,000 sq m or more, or water use of 40,000 litres a day or more, or waste of 100 kg a day or more.
Environmental compensation
CPCB prepares guidelines on compensation under the Polluter Pays principle. State Pollution Control Boards and Pollution Control Committees levy it.
RDF use
Industries using solid fuel, including cement and waste-to-energy plants, must replace it with RDF. The substitution rate rises from 5 to 15 per cent over six years.
Buffer zone
Facilities with installed capacity above 5 tonnes per day must keep a buffer zone within the allotted area. CPCB will set its size.

Don’t confuse with SWM Rules 2016 vs 2026: The 2016 Rules are superseded; the 2026 Rules apply from 1 April 2026.

Don’t confuse with CPCB vs CAQM: CPCB issued a 2021 direction under the EP Act; CAQM issued Direction no. 91 in June 2025 for NCR legacy waste.

Don’t confuse with EPR vs Extended Bulk Waste Generator Responsibility: EPR applies to producers of products; the new bulk generator responsibility applies to large waste generators.

Don’t confuse with EPR vs EBWGR: Extended Producer Responsibility makes producers answerable for post-consumer waste. Extended Bulk Waste Generator Responsibility makes large waste generators answerable for their own waste.

Laws, judgments and statutory bodies: 30 Prelims questions since 2013 (what the law says, who chairs, legal basis). In Mains, 44 news-triggered questions, most in GS2, asking for provisions and challenges.

Test yourself

Worth revising until Prelims 2028: most news questions come within two years of the event.

2

Law and statutory body

Census 2027

GS2 Governance - Census and Census Act, 1948GS1 PopulationPrelims and Mains

Why in news
On 30 March 2026, the Registrar General and Census Commissioner announced that Census 2027 begins with Phase I on 1 April 2026, with self-enumeration for the first time.
What it is
Census 2027 is India's national population count, run by the Ministry of Home Affairs under the Census Act, 1948. It has two phases: Houselisting and Housing Census, then Population Enumeration. This round is the first to use digital tools, including a mobile app and an online self-enumeration option.
Legal basis
Census is conducted under the Census Act, 1948. Information collected is confidential and used only for statistical purposes and development planning.
Digital first
Data is collected through a dedicated mobile app, while door-to-door enumeration continues.
Self-Enumeration dates
In Tamil Nadu and Tripura, self-enumeration runs till 31 July 2026. Field enumeration follows from 1 to 30 August 2026.
HLO questionnaire
The Houselisting phase covers housing conditions, household details, amenities and assets, using 33 notified questions.
Nodal ministry
The Census is conducted by the Registrar General and Census Commissioner of India under the Ministry of Home Affairs. It is a Union subject in the Seventh Schedule (Entry 69, Union List).
Digital features
Includes the CMMS portal for near real-time monitoring, a houselisting mobile app and a self-enumeration portal. Data centres are designated Critical Information Infrastructure (CII).
HLO window
The Houselisting phase runs across the country between 1 April and 30 September 2026. Each State/UT does a 30-day field operation.
Questions
33 questions for Phase I were notified in January 2026, on housing condition, amenities and assets.
Self-Enumeration ID
On submission, a unique SE ID is generated and shared with the enumerator at the field visit for confirmation.
First states
Self-Enumeration began in Andaman and Nicobar Islands, Goa, Karnataka, Lakshadweep, Mizoram, Odisha, Sikkim, and the NDMC and Delhi Cantonment areas. Houselisting there runs from 16 April to 15 May 2026.
Reference date
The reference date is 1 March 2027. For Ladakh, snow-bound areas of J&K, Uttarakhand and Himachal Pradesh it is 1 October 2026.
Caste enumeration
Castes will be enumerated in Phase II, as decided by the Cabinet Committee on Political Affairs (CCPA).
Outlay
The Union Government approved an outlay of ₹11,718.24 crore.
Self-enumeration
Respondents fill the schedule on a portal, get a unique SE ID and give it to the enumerator.
Notification
The Centre notified its intent to hold the Census by Gazette Notification on 16 June 2025.
Tool developer
C-DAC developed the digital platforms for enumeration.
Phase 2 and reference date
Population Enumeration is in February 2027, with reference date 1 March 2027. Ladakh and snow-bound areas of J&K, Himachal Pradesh and Uttarakhand use 1 October 2026.
Caste question
Caste-related questions will be included in the second phase.

Don’t confuse with Census vs Sample Registration System: The Census is a full count every ten years. The SRS is a yearly sample survey that estimates birth and death rates.

Don’t confuse with Houselisting phase vs Population Enumeration phase: Houselisting records housing and assets of households. Population Enumeration records details of each person.

Don’t confuse with Census vs SECC: The Census is under the Census Act, 1948. The Socio-Economic and Caste Census of 2011 was a separate exercise and not under that Act.

Don’t confuse with Census Act, 1948 vs Registration of Births and Deaths Act, 1969: The Census Act governs the decennial count. The 1969 Act governs civil registration of births and deaths.

Don’t confuse with HLO vs Population Enumeration: HLO covers housing, amenities and assets. Population Enumeration collects details of each person.

Don’t confuse with Houselisting vs Population Enumeration: Phase I covers houses, amenities and assets. Phase II covers each person: demographics, education, migration, fertility and caste.

Don’t confuse with SECC 2011 vs Census: The Socio-Economic and Caste Census 2011 was a separate exercise. Census 2027 enumerates caste within the Census itself under the Census Act.

Don’t confuse with Census vs NPR: The Census is a count under the Census Act, 1948. The National Population Register is a register of usual residents under the Citizenship Act, 1955.

Laws, judgments and statutory bodies: 30 Prelims questions since 2013 (what the law says, who chairs, legal basis). In Mains, 44 news-triggered questions, most in GS2, asking for provisions and challenges.

Test yourself

Worth revising until Prelims 2028: most news questions come within two years of the event.

3

Scheme

Electronics Component Manufacturing Scheme (ECMS)

GS3 Industry and electronicsPrelims and Mains

Why in news
On 30 March 2026, MeitY approved 29 more proposals under the Electronics Component Manufacturing Scheme (ECMS), with Rs 7,104 crore of projected investment. Overall approvals now stand at 75 applications.
What it is
The Electronics Component Manufacturing Scheme (ECMS) is a MeitY scheme that supports domestic making of electronic components, sub-assemblies, supply chain items and related capital goods. It aims to cut import dependence and deepen value addition in India's electronics manufacturing.
Cumulative approvals
With this round, 75 applications are approved, with expected investment of Rs 61,671 crore and 65,040 direct jobs.
Firsts
Approvals include the country's first SMD passive plant for tantalum-based capacitors, first flexible PCB plant and first rare earth permanent magnet facility.
Budget outlay
The latest Union Budget raised the ECMS outlay to Rs 40,000 crore, as welcomed by the ICEA chairman.
Implementing ministry
ECMS is run by the Ministry of Electronics and Information Technology (MeitY).
Aluminium extrusion
Hindalco is approved to make aluminium extrusions for mobile phone enclosures, which are now 100% imported.

Don’t confuse with ECMS vs PLI: PLI gives incentives on incremental sales of finished products such as mobiles. ECMS supports components, sub-assemblies, supply chain items and capital goods.

Don’t confuse with ECMS vs PLI for Electronics: ECMS targets components, sub-assemblies, supply chain items and capital goods. PLI schemes for mobile and IT hardware reward sales of finished products.

Schemes: 52 Prelims questions since 2013, 10 in Prelims 2026 alone. They test features, the period and who funds it. In Mains, 33 news-triggered questions, mostly GS3.

Test yourself

Worth revising until Prelims 2027: most news questions come within two years of the event.

4

Scheme

National Green Hydrogen Mission (SIGHT Mode 2B)

GS3 EnergyPrelims and Mains

Why in news
On 30 March 2026, MNRE and the Department of Fertilizers exchanged 10-year Green Ammonia Purchase and Supply Agreements under the National Green Hydrogen Mission, covering about 7.24 lakh tonnes a year for 13 fertiliser units.
What it is
The National Green Hydrogen Mission aims to make India a global hub for producing, using and exporting green hydrogen and its derivatives. SIGHT (Strategic Interventions for Green Hydrogen Transition) is its incentive programme. Mode 2B supports green hydrogen production at refineries.
Objective
NGHM aims to make India a global hub for production, usage and export of green hydrogen and its derivatives.
SIGHT
SIGHT stands for Strategic Interventions for Green Hydrogen Transition. Mode 2B covers refinery green hydrogen production.
Implementation model
Projects run on Build Own Operate basis through private developers, who make project-specific investments.
Nodal ministry
The Mission is run by the Ministry of New and Renewable Energy.
Outlay
The Mission was launched in 2023 with an outlay of ₹19,744 crore.
Targets
The Mission targets 5 MMT of green hydrogen capacity, backed by 125 GW of dedicated renewable energy capacity.
Certification portal
The GHCI portal, developed by MNRE, supports certification and compliance under the Green Hydrogen Certification Scheme of India.
Electrolyser manufacturing
Incentives have gone to 15 companies for 3,000 MW per annum of indigenous electrolyser capacity.
State policies
Six states have notified dedicated green hydrogen policies, seven have integrated hydrogen into existing policies, and four more are finalising theirs.
Mission outlay
The Mission has an outlay of ₹19,744 crore.
2030 target
The Mission targets at least 5 million metric tonnes of green hydrogen a year by 2030.
Who ran the bidding
SECI ran competitive bidding for supply of green ammonia to fertiliser units.
Allocation
About 7,24,000 tonnes per annum was allocated to developers, linked to 13 fertiliser units.
Prices
The lowest discovered price is about ₹49.75 per kg, in a range of ₹49.75 to 64.74 per kg.
Forex savings
Savings of about $2.5 billion over 10 years are expected by replacing imported grey ammonia in non-urea fertiliser units.
Notifying body
MNRE notified the standards on 27 February 2026 under the National Green Hydrogen Mission.
Renewable energy definition
Renewable energy includes stored or grid-banked renewable electricity.
Verification
Measurement, monitoring, verification and certification methods will be issued separately by MNRE.
Project cost
The jetty is approved at an estimated ₹797.17 crore.
Capacity
The facility will handle 4.0 million tonnes per annum.
Port support
The Port Authority gives capital support of 20% of the cost, ₹159.43 crore, during construction.
Timeline
The project is expected to be completed within 24 months.
Other cargo
The jetty will also handle other liquid cargo to ensure use during the early phase of the green hydrogen sector.

Don’t confuse with Green vs grey hydrogen: Green hydrogen is made by electrolysis of water using renewable power. Grey hydrogen is made from natural gas or other fossil fuels and emits CO2.

Don’t confuse with BOO vs BOT: In BOO the developer keeps ownership of the asset. In BOT, it is transferred to the authority after a fixed period.

Don’t confuse with SIGHT vs the Mission: SIGHT is the incentive programme within the Mission, not the Mission itself.

Don’t confuse with Green vs grey ammonia: Green ammonia is made from hydrogen produced by electrolysis using renewable power. Grey ammonia is made from fossil fuels, and India imports it for fertilisers.

Don’t confuse with Biogenic vs non-biogenic emissions: The thresholds count only non-biogenic greenhouse gas emissions, not those from biological sources.

Don’t confuse with Green hydrogen vs green ammonia: Ammonia is a derivative made from green hydrogen. It is easier to store and ship.

Schemes: 52 Prelims questions since 2013, 10 in Prelims 2026 alone. They test features, the period and who funds it. In Mains, 33 news-triggered questions, mostly GS3.

Test yourself

Worth revising until Prelims 2028: most news questions come within two years of the event.

5

Law and statutory body

Designated Repositories under Biological Diversity Act, 2002

GS3 Environment and biodiversityPrelims and Mains

Why in news
On 30 March 2026, the Environment Ministry designated CMLRE's 'Bhavasagara' Referral Centre in Kochi as the National Repository for Deep-Sea Fauna under the Biological Diversity Act, 2002.
What it is
Designated Repositories are institutions notified by the Central Government under Section 39 of the Biological Diversity Act, 2002. They keep authenticated specimens of biological material, including voucher and type specimens, that have been accessed or studied under the Act. The National Biodiversity Authority recommends which institutions should be notified.
Legal basis
The Central Government designates repositories under Section 39 of the Biological Diversity Act, 2002.
Who recommends
The National Biodiversity Authority recommended the proposal. The Centre then notified it.
Role of repositories
They preserve authenticated biological specimens accessed under the Act.
Mandate of this museum
It will hold voucher specimens of select flora and fauna. It will also be the depository for type specimens of newly discovered species from the region.
Host institution
The museum was set up in 2022 under Mizoram University, a Central University created by an Act of Parliament.
Duty on discoverers
A person who discovers a new taxon must notify the designated repository and deposit the voucher specimens.
Role of NBA
NBA issues guidelines on criteria for designation. Its governing body considers proposals and recommends them to the Ministry for notification.
Number of repositories
With 18 institutions designated so far, these two additions raise the network further.
Bhavasagara centre
The Referral Centre Bhavasagara at CMLRE, Kochi, is a national facility for deep-sea biodiversity with over 3,500 identified, geo-referenced voucher specimens.
National Biodiversity Authority
The NBA is a statutory body set up under the 2002 Act, headquartered at Chennai.
Who designated it
The Ministry of Environment, Forest and Climate Change designated the centre. It is run by CMLRE under the Ministry of Earth Sciences.
Collection size
It holds over 3,500 taxonomically identified, geo-referenced voucher specimens.
Type specimens
It is the official custodian for any new deep-sea species discovered in Indian waters.
Location
CMLRE is based at Kochi, Kerala.

Don’t confuse with Designated Repository vs Biodiversity Heritage Site: A Designated Repository (Section 39) stores specimens. A Biodiversity Heritage Site (Section 37) is an area of ecological value notified by the State Government.

Don’t confuse with Voucher vs type specimen: A voucher specimen is a preserved sample that documents a study or identification. A type specimen is the reference specimen on which a species' formal description is based.

Don’t confuse with Designated repository vs Biodiversity Management Committee: Repositories are scientific institutions notified by the Centre to hold specimens. BMCs are local-body committees that document local biodiversity.

Don’t confuse with Section 39 vs access and benefit sharing sections: Section 39 deals with repositories. Access and benefit sharing is governed by separate provisions of the Act.

Don’t confuse with Designated repository vs. Biodiversity Heritage Site: A repository stores authenticated specimens (Section 39). A Biodiversity Heritage Site is an area of ecological value notified by the State Government (Section 37).

Don’t confuse with CMLRE vs. NIOT: CMLRE explores and manages marine living resources. NIOT, Chennai, develops ocean technology. Both are under MoES.

Laws, judgments and statutory bodies: 30 Prelims questions since 2013 (what the law says, who chairs, legal basis). In Mains, 44 news-triggered questions, most in GS2, asking for provisions and challenges.

Test yourself

Worth revising until Prelims 2028: most news questions come within two years of the event.

6

Economy

Agricultural Credit: KCC, Ground Level Credit and Priority Sector Lending

GS3 Agriculture / CreditPrelims and Mains

Why in news
On 30 March 2026 the Finance Ministry told Lok Sabha about steps to widen Kisan Credit Card access, including priority sector norms, interest subvention and digital portals.
What it is
The Kisan Credit Card (KCC) gives farmers short-term credit for crops and related needs through one revolving limit. Its reach is shaped by RBI's Priority Sector Lending norms, yearly Ground Level Credit targets and the Modified Interest Subvention Scheme. Since 2019 it also covers working capital for animal husbandry, dairying and fisheries.
PSL agriculture target
Covered banks must lend at least 18% of ANBC or CEOBSE, whichever is higher, to agriculture. Of this, 10% is a sub-target for small and marginal farmers.
KCC extended to allied activities
Since 2019 the KCC covers working capital for animal husbandry, dairying and fisheries.
Digital channels
Jan Samarth is a one-stop portal linking government-sponsored loans, including KCC. NABARD's e-KCC portal lets RRB and rural cooperative bank applicants apply without visiting branches.
District-level credit incentives
PSL norms give incentives for districts with low priority sector credit flow and disincentives for districts with high flow, to spread credit more evenly.
KCC extension
Since 2019, KCC covers working capital for animal husbandry, dairying and fisheries.
PLP and GLC
NABARD prepares the district Potential Linked Credit Plan under the Lead Bank Scheme; these are aggregated at state level and inform the GLC target.

Don’t confuse with MISS vs the Rs 2 lakh collateral-free limit: MISS is a government interest subsidy on KCC short-term loans. The collateral-free limit is an RBI rule on security for such loans. They are separate instruments.

Don’t confuse with GLC target vs PSL norm: The Ground Level Credit target is set yearly by the Government for banks. The PSL norm is a standing RBI percentage requirement.

Don’t confuse with GLC target vs PSL target: GLC is a yearly government target for agri credit set by region, agency and loan type. PSL is an RBI norm of a share of bank credit (18% for agriculture).

Don’t confuse with Interest subvention vs prompt repayment incentive: The 7% rate is after the subvention. The extra 3% for prompt repayment brings it to 4%.

Economy terms and data: 42 Prelims questions since 2013, rising in recent years; they test what a term or instrument means. In Mains, 12 news-triggered questions.

Test yourself

Worth revising until Prelims 2027: most news questions come within two years of the event.

7

Science and technology

Bio-Bitumen from Crop Residue (CSIR)

GS3 Science and technology, EnvironmentPrelims and Mains

Why in news
On 30 March 2026, CSIR held a technology transfer event in New Delhi to hand over its bio-bitumen process, made from farm residue, to industry for large-scale adoption.
What it is
Bio-bitumen is a renewable binder for road surfacing, made from lignocellulosic biomass such as crop residue. It is meant to replace part or all of petroleum-based bitumen. The process was developed jointly by CSIR-CRRI and CSIR-IIP.
Developers
CSIR-Central Road Research Institute and CSIR-Indian Institute of Petroleum developed the process jointly.
Feedstock and process
It uses agricultural biomass and crop residues as feedstock and a thermochemical conversion process.
Intended user
The technology is meant for adoption by the Ministry of Road Transport and Highways in road construction.
Problems addressed
It targets pollution from agricultural waste and rising dependence on imported bitumen.
CSIR
CSIR is an autonomous research body, with the Prime Minister as its President; its Director General also serves as Secretary, DSIR.

Don’t confuse with Bio-bitumen vs biofuel/ethanol: Bio-bitumen is a road binder from biomass, not a transport fuel like ethanol or biodiesel.

Don’t confuse with CSIR-CRRI vs CSIR-IIP: CRRI is the road research institute; IIP (Dehradun) works on petroleum and fuels. Both developed this process.

Science and technology: 57 Prelims questions since 2013; most test the concept behind the news, not the news itself. In Mains, 12 news-triggered questions.

No practice question for this one; the card may still help an answer. Why: Lasting topic linking stubble burning and import reduction, but few testable facts.

Worth revising until Prelims 2027: most news questions come within two years of the event.

8

Scheme

National Skills Qualifications Framework (NSQF)

GS2 Education and skillingPrelims and Mains

Why in news
On 30 March 2026, the Skill Development Minister told the Lok Sabha how the National Skills Qualifications Framework (NSQF) is being implemented. He gave the number of NSQF-aligned qualifications as on 31 December 2025 and listed steps to match skilling with industry needs.
What it is
The NSQF is a competency-based framework that arranges qualifications into levels 1 to 8 by learning outcomes. It covers formal, non-formal and informal learning. It aims to give vocational and general education equal standing and to allow movement between them.
Launch and rationalisation
NSQF was launched in December 2013. It was rationalised and notified in June 2023.
Levels
The framework has eight levels. Each level reflects different skill, complexity, knowledge, responsibility and autonomy.
Regulator
NCVET is the overarching regulator for technical and vocational education and training. It sets regulations and standards for quality.
Sector Skill Councils
36 industry-led Sector Skill Councils identify sector skill needs and set competency standards.
Link to higher education
UGC allows up to 50% of the credit requirement of a UG/PG programme to be met through skill courses, including NSQF-aligned qualifications.

Don’t confuse with NSQF vs NCrF: NSQF organises qualifications into levels by learning outcomes. The National Credit Framework is a credit accumulation and transfer system covering school, higher and vocational education.

Don’t confuse with NCVET vs Sector Skill Councils: NCVET is the regulator that recognises awarding bodies. Sector Skill Councils are industry-led bodies that identify skill needs and set standards.

Schemes: 52 Prelims questions since 2013, 10 in Prelims 2026 alone. They test features, the period and who funds it. In Mains, 33 news-triggered questions, mostly GS3.

No practice question for this one; the card may still help an answer. Why: Framework launched 2013, rationalised 2023, levels 1 to 8. Standing facts, but UPSC rarely tests it.

Worth revising until Prelims 2027: most news questions come within two years of the event.

9

Scheme

Revamped Distribution Sector Scheme (RDSS)

GS3 EnergyPrelims and Mains

Why in news
On 30 March 2026, the Power Ministry told the Rajya Sabha that RDSS works worth Rs 2.83 lakh crore are sanctioned and AT&C losses fell to 15.04% in FY25.
What it is
The Revamped Distribution Sector Scheme (RDSS) is a Centre-backed reform scheme for power distribution companies (DISCOMs), launched in 2021. It funds loss-reduction works and smart metering. Funds are tied to DISCOMs meeting operational and financial performance conditions.
Objective
RDSS aims to cut AT&C losses to 12-15% and close the gap between Average Cost of Supply and Average Revenue Realised.
Sanctioned outlay
Rs 1.53 lakh crore is sanctioned for loss reduction and Rs 1.31 lakh crore for smart metering, on State proposals.
Monitoring bodies
PFC and REC are nodal agencies. A State Distribution Reforms Committee is headed by the Chief Secretary. A central Inter-Ministerial Monitoring Committee is headed by Secretary (Power).
Conditional funding
Funds are released only if DISCOMs improve parameters such as timely subsidy payment, regular tariff orders, publishing accounts and not creating regulatory assets.
Loss trend
National AT&C losses fell from 21.91% in FY21 to 15.04% in FY25.

Don’t confuse with AT&C loss vs ACS-ARR gap: AT&C loss measures energy lost and revenue not collected. The ACS-ARR gap is the per-unit difference between cost of supplying power and revenue realised.

Don’t confuse with RDSS vs UDAY: UDAY (2015) was a DISCOM debt restructuring scheme. RDSS (2021) gives results-linked funding for infrastructure and metering.

Schemes: 52 Prelims questions since 2013, 10 in Prelims 2026 alone. They test features, the period and who funds it. In Mains, 33 news-triggered questions, mostly GS3.

No practice question for this one; the card may still help an answer. Why: Lasting scheme with AT&C loss target of 12-15% and smart metering; schemes are 52 of 327 Prelims questions but this reply adds little fresh.

Worth revising until Prelims 2027: most news questions come within two years of the event.

10

Scheme

Jan Samarth Portal

GS3 Economy · Financial inclusionGS2 Welfare schemesPrelims and Mains

Why in news
On 30 March 2026 the Ministry of Finance released progress figures for the Jan Samarth portal as on 20 March 2026: about 41.14 lakh applications worth ₹1,06,306 crore processed.
What it is
Jan Samarth is a digital single-window portal run under the Ministry of Finance. It links applicants for government credit-linked schemes directly with lenders. It checks eligibility, gives in-principle sanction and sends the application to a bank branch.
Launch
The portal was launched on 6 June 2022 as a platform for credit-linked government schemes.
Schemes covered
It is a unified gateway for applications to 16 credit-linked Central Government schemes.
Languages
It is available in 8 languages, to help rural and underprivileged users.
Lenders
269 Member Lending Institutions are onboarded, including banks, NBFCs, RRBs and cooperative banks.
Data integration
It runs real-time checks against government databases such as UIDAI, UDYAM, AgriStack and GST.
Lenders onboarded
About 254 lenders onboarded as on 20 March 2026, including 12 PSBs, 20 private banks, 28 RRBs, 173 DCCBs, 15 NBFCs and 6 SFBs.
Progress
41.14 lakh applications worth ₹1,06,306 crore processed; banks gave digital approval to 35.07 lakh beneficiaries worth ₹84,365.55 crore.
How it works
The portal checks eligibility, gives in-principle sanction and forwards the application to the chosen bank branch.
Data links
Real-time checks with CBDT, GST, UDYAM, NeSL, UIDAI, CIBIL, AgriStack and others speed up processing.

Don’t confuse with Jan Samarth vs Jan Dhan: Jan Samarth is a credit-application portal for linked schemes. Jan Dhan Yojana is about opening bank accounts.

Don’t confuse with Jan Samarth vs UDGAM/other portals: Jan Samarth links applicants to lenders for scheme loans. It is not a regulator or a credit bureau, though it uses CIBIL data.

Don’t confuse with Jan Samarth vs Udyamimitra: Both are digital loan portals. Jan Samarth covers 15 Central credit-linked schemes across sectors, not only MSME loans.

Schemes: 52 Prelims questions since 2013, 10 in Prelims 2026 alone. They test features, the period and who funds it. In Mains, 33 news-triggered questions, mostly GS3.

No practice question for this one; the card may still help an answer. Why: Single portal for 15 credit-linked schemes, launched 6 June 2022. Lasting platform, but few testable features.

Worth revising until Prelims 2028: most news questions come within two years of the event.

11

Scheme

Price Support Scheme (PSS) for Pulses and Oilseeds

GS3 Agriculture and MSPPrelims and Mains

Why in news
On 30 March 2026, Agriculture Minister Shivraj Singh Chouhan approved procurement of over 18 lakh tonnes of Rabi pulses and oilseeds at MSP under the Price Support Scheme in Haryana, Uttar Pradesh and Karnataka, worth over Rs 11,698 crore.
What it is
The Price Support Scheme (PSS) lets the Centre buy pulses, oilseeds and copra from farmers at MSP when market prices fall below it. States send proposals and the Centre approves the quantity. Procurement is done through central nodal agencies such as NAFED and NCCF.
Karnataka safflower
Only 25 per cent of the state's proposal, 6,923 tonnes of kusum (safflower), was approved, at an MSP of Rs 65,400 per tonne.
Payment mechanism
States already have POS-based procurement in place, which is meant to ensure transparent payment to farmers.
Nodal agencies
Central nodal agencies NAFED and NCCF carry out PSS procurement. PSS is part of the PM-AASHA umbrella scheme.

Don’t confuse with PSS vs Price Stabilisation Fund (PSF): PSS buys crops at MSP to protect farmers when prices fall. PSF builds buffer stocks to control consumer prices of pulses and onions.

Don’t confuse with PSS vs Price Deficiency Payment Scheme (PDPS): Under PSS the government physically buys the crop. Under PDPS it pays farmers the difference between MSP and the market price, without buying.

Schemes: 52 Prelims questions since 2013, 10 in Prelims 2026 alone. They test features, the period and who funds it. In Mains, 33 news-triggered questions, mostly GS3.

No practice question for this one; the card may still help an answer. Why: Lasting MSP procurement mechanism, but this release is a state-wise approval with little new.

Worth revising until Prelims 2027: most news questions come within two years of the event.

Quick facts

  • Jan Dhan Darshak App shows 99.92% of villages have a banking outlet within 5 km (as on 6 March 2026).
  • NHAI has realised Rs 28,307 crore through InvIT and TOT monetisation in FY 2025-26 against a Rs 30,000 crore target.
  • A record 30 mineral blocks were operationalised in FY 2025-26, the highest in a single year.
  • INS Agray, fourth of eight ASW Shallow Water Craft built by GRSE Kolkata, was delivered to the Navy on 30 March 2026.

Source: PIB, 30 Mar

What we left out: 61 of 76 releases
  • Tributes and greetings (3)
  • Routine project approvals (1)
  • Visit schedules (3)
  • Routine data replies (23)
  • Same issue as another release (10)
  • Routine data releases (4)
  • Recruitment and results notices (2)
  • Routine portal updates (2)
  • Lab research findings (2)
  • Budget explainers without decision (1)
  • Routine MoUs (3)
  • Briefings without a decision (1)
  • Production records (1)
  • Ceremonies and campaigns (1)
  • Speeches without a decision (4)

Practise the day’s news

Mains question of the day

15 marks · 250 words

The Solid Waste Management Rules, 2026, which supersede the 2016 rules, come into effect from 1 April 2026. Examine the key provisions of the new rules and discuss the challenges in implementing them effectively, especially for urban and rural local bodies.

From: Solid Waste Management Rules, 2026

Write and get it marked

Keep reading

All days