  1. Viksit Bharat – Guarantee for Rozgar and Aajeevika Mission (Gramin) Act, 2025 (VB-G RAM G). VB-G RAM G Act guarantees 125 days rural wage work under a Centrally Sponsored Scheme.
  2. PLI Scheme. PLI ACC scheme: ₹18,100 crore for 50 GWh of domestic battery cell capacity.
  3. PLI Scheme for Food Processing Industry (PLISFPI). PLISFPI progress: 169 approvals, ₹9,207 crore investment, ₹2,162.55 crore incentive paid, 3.39 lakh jobs.
  4. Khelo Bharat Niti 2025 (National Sports Policy). Khelo Bharat Niti 2025 sets a national sports framework; sports stays mainly a State subject.
  5. Arbitration Council of India. Arbitration Council of India, created in law in 2019, is still not constituted.
  6. PANKHUDI Portal. MWCD's PANKHUDI portal lets donors give non-cash support to women and child schemes; 38 registered.
  7. Protection of Children from Sexual Offences (POCSO) Act, 2012. Government tells Lok Sabha it will keep age of consent at 18 under POCSO.
  8. GenomeIndia Project. GenomeIndia has sequenced 10,000+ Indian genomes; government lists other personalised medicine steps in Lok Sabha.
  9. Tele-MANAS (National Tele Mental Health Programme). Tele-MANAS now has 53 cells in 36 States/UTs, 20 languages, app and video calls.
  10. Seeds Act, 1966 and SATHI Portal. States enforce seed quality under the Seeds Act; SATHI portal tracks seeds digitally.
  11. Formation and Promotion of 10,000 FPOs Scheme. 10,000 FPOs formed under the central scheme; 21.96 lakh of 56.32 lakh members are women.
1

Law and statutory body

Viksit Bharat – Guarantee for Rozgar and Aajeevika Mission (Gramin) Act, 2025 (VB-G RAM G)

GS2 Welfare schemesGS3 Inclusive growthPrelims and Mains

Why in news
On 6 February 2026, the Minister of State for Rural Development told the Rajya Sabha the core objectives and key provisions of the VB-G RAM G Act, 2025, including 125 days of work and a 60:40 funding split.
What it is
The Viksit Bharat – Guarantee for Rozgar and Aajeevika Mission (Gramin) Act, 2025 is a Central law on rural wage employment. It gives eligible rural households a statutory entitlement to guaranteed wage employment and aims at durable rural assets and livelihoods. It takes the place of the earlier rural employment guarantee framework under which households had 100 days of work.
Wage floor
No notified daily wage anywhere in the country will be below ₹300.
National average wage
The national average notified wage rose from ₹298.8 to ₹327.4 per day, an increase of over 10 per cent.
Interim allocation
The Centre has released an interim allocation of ₹95,692.31 crore to States and UTs.
Launch venue
The National Launch Programme is on 2 July 2026 at Mukkavaripalle Village, Tirupati District, Andhra Pradesh.
Ministry
The Act is administered by the Ministry of Rural Development.
Days of guaranteed work
The statutory guarantee rises from 100 to 125 days for every eligible rural household.
Commencement date
The Act comes into force across rural India from July 1, 2026.
Role of Gram Panchayats
The Act places Gram Panchayats at the centre, stressing durable assets, water conservation, SHGs and convergence with other rural programmes.
State readiness
29 States/UTs have made budget provisions and 24 States have notified the VB-G RAM G State Scheme.
Job card transition
Existing e-KYC verified job cards stay valid until new Gramin Rozgar Guarantee Cards are issued.
Commencement
The Act is to be rolled out nationwide from 1 July 2026, notified on 11 May 2026.
Repeal of MGNREGA
MGNREGA, 2005 stands repealed from the date the new Act commences.
Guarantee
Each rural household whose adult members volunteer for unskilled manual work is entitled to 125 days of wage employment every financial year.
Unemployment allowance
If work is not given within the prescribed time after demand, workers are entitled to unemployment allowance.
Funding pattern
Centrally Sponsored Scheme under Section 22. Sharing is 90:10 for North-Eastern States, Himalayan States and UTs (Uttarakhand, Himachal Pradesh, J&K), and 60:40 for all other States and UTs with legislature.
State scheme
Under Section 3(1), each State must notify a Scheme consistent with the Act within six months of its commencement.
Normative allocation
The Central Government decides State-wise normative allocation on objective parameters it prescribes (Section 22(4)).
Type of scheme
Section 22 makes the scheme a Centrally Sponsored Scheme.
Fund sharing
The Centre-State ratio is 90:10 for North-Eastern and Himalayan States and the UT of Jammu and Kashmir, and 60:40 for all other States and UTs with legislature.
State-wise allocation
Under Section 22(4), the Centre decides each State's normative allocation on objective parameters it prescribes.
Special relaxations
In disasters or pandemics, States may recommend relaxations. The Centre can allow wider permissible works, relaxed documentation and temporarily more employment.
Plan approval
The Gram Panchayat prepares the Viksit Gram Panchayat Plan and the Gram Sabha approves it (Schedule I, para 5(2)).
50% works through Gram Panchayats
At least half of the total works, by cost, must be implemented through Gram Panchayats.
Gati Shakti link
Village plans are integrated with PM Gati Shakti, use geospatial systems, and are aggregated at Block, District, State and National levels.
Guaranteed days
At least 125 days of wage employment per rural household per financial year, up from 100 days.
Women's participation
At least one-third participation of women is mandatory, with special job cards for women-headed households and single women.
Crèche
A crèche is to be provided at worksites where five or more children under five accompany working women.
Councils
One-third women representation is mandatory in the Central and State Rojgar Guarantee Councils.
Work themes
Works are prioritised under four themes: water security, core rural infrastructure, livelihood infrastructure and mitigation of extreme weather events.
Nature of scheme
The scheme under the Act is a Centrally Sponsored Scheme.
Allocation
The Centre fixes State-wise normative allocation on objective parameters, under Section 22(4).
Planning
Works are chosen through Viksit Gram Panchayat Plans approved by the Gram Sabha and aggregated up to the national level, in four thematic domains.
Four thematic domains
Water security works, core rural infrastructure, livelihood infrastructure, and special works for extreme weather events and disaster preparedness.
Allocation to States
The Central Government determines State-wise normative allocation on objective parameters it prescribes (Section 22(4)).
Planning link
Works are planned through Viksit Gram Panchayat Plans, integrated with PM Gati Shakti and aggregated at Block, District, State and National levels.
Wage payment
Wages must be paid within one week. If payment is delayed beyond 15 days, workers get 0.05 percent extra as interest on dues.
Role of Gram Sabha
The Gram Sabha takes the decision on which village-related works are to be undertaken.
Women's share
33 percent of the work under the scheme is reserved for women.
Farm work window
State governments can notify deployment of workers for agricultural operations for a maximum of 60 days during sowing and harvesting.
Administrative expenditure
Administrative expenditure is raised from 6 percent to 9 percent to avoid delays in payments to employment assistants.

Don’t confuse with VB-G RAM G vs MGNREGA: MGNREGA, 2005 guaranteed 100 days of work per household. VB-G RAM G raises the entitlement to 125 days and adds a focus on durable assets and livelihoods.

Don’t confuse with VB-G RAM G Act vs earlier rural employment guarantee law: The new Act raises the guarantee from 100 to 125 days and replaces the earlier framework; the 100-day figure belongs to the old one.

Don’t confuse with Interim allocation vs final allocation: The ₹95,692.31 crore is an interim sum for a smooth start, not the full annual allocation.

Don’t confuse with VB–G RAM G vs MGNREGA: MGNREGA, 2005 gave 100 days and is repealed; VB–G RAM G gives 125 days from 1 July 2026.

Don’t confuse with Notification vs commencement: The notification was on 11 May 2026; the Act applies from 1 July 2026.

Don’t confuse with VB-G RAM G vs earlier 100-day framework: The new Act raises the guarantee to 125 days, makes the scheme Centrally Sponsored with normative allocation, and adds an off-season employment guarantee.

Don’t confuse with VB-G RAM G vs the earlier rural employment guarantee: The earlier framework gave 100 days of work. The 2025 Act guarantees 125 days.

Don’t confuse with VB-G RAM G vs MGNREGS: MGNREGS gave 100 days of work; VB-G RAM G gives 125 days and adds Viksit Gram Panchayat Plans linked to PM Gati Shakti.

Don’t confuse with Gram Panchayat vs Gram Sabha: The Gram Panchayat is the elected village body that prepares plans and executes works; the Gram Sabha of village voters approves plans and conducts social audits.

Don’t confuse with VB-G RAM G Act vs MGNREGA: The new Act gives 125 days of guaranteed work; the earlier framework gave 100 days.

Don’t confuse with VB-G RAM G Act vs earlier MGNREGA: The earlier framework guaranteed 100 days of work; VB-G RAM G guarantees 125 days and adds thematic works and a digital governance layer.

Don’t confuse with Centrally Sponsored vs Central Sector Scheme: Centrally Sponsored Schemes share cost with States; Central Sector Schemes are fully funded by the Centre.

Laws, judgments and statutory bodies: 30 Prelims questions since 2013 (what the law says, who chairs, legal basis). In Mains, 44 news-triggered questions, most in GS2, asking for provisions and challenges.

Test yourself

Worth revising until Prelims 2028: most news questions come within two years of the event.

2

Scheme

PLI Scheme: National Programme on Advanced Chemistry Cell (ACC) Battery Storage

GS3 Industry and energy storagePrelims and Mains

Why in news
On 6 February 2026, the Minister of State for Heavy Industries told the Rajya Sabha about the PLI ACC scheme, including Round-2 terms and Reliance's agreement for 10 GWh.
What it is
The National Programme on Advanced Chemistry Cell (ACC) Battery Storage is a Production Linked Incentive scheme run by the Ministry of Heavy Industries. It gives incentives to firms that set up large-scale ACC manufacturing in India. ACCs are new-generation devices that store electrical energy as electrochemical or chemical energy and convert it back to electricity when needed.
Approval and outlay
The scheme was approved in May 2021 with a total outlay of ₹18,100 crore.
Target capacity
The scheme aims to build 50 GWh of domestic ACC manufacturing capacity.
Capacity awarded
Of the 50 GWh, 40 GWh has been awarded to four beneficiary firms.
Aim
The scheme seeks to cut dependence on imported ACCs and build a globally competitive manufacturing ecosystem.
Technology
Beneficiary firms report using in-house developed ACC technology.
Administering ministry
The scheme is administered by the Ministry of Heavy Industries.
Implementation challenges
Firms face limited technology, a skilled manpower gap, dependence on imported critical equipment and no upstream components such as CAM, AAM and electrolyte.
National Critical Mineral Mission
Run by the Ministry of Mines, approved on 29 Jan 2025, to secure the critical mineral value chain from exploration to recovery from end-of-life products.
Outlay and capacity
Approved in May 2021 with an outlay of ₹18,100 crore to build 50 GWh of domestic ACC capacity.
Incentive basis
Incentive depends on the subsidy per kWh quoted by the firm and the percentage of value addition achieved on actual sales.
Value addition targets
At least 25% value addition within 2 years at Mother Unit level, rising to 60% within 5 years of the appointed date.
Technology neutrality
The scheme is technology agnostic, and superior technologies get higher incentives. R&D spending counts towards investment criteria.

Don’t confuse with PLI ACC vs FAME / PM E-DRIVE: PLI ACC subsidises battery cell manufacturing. FAME and PM E-DRIVE support electric vehicle demand and adoption.

Don’t confuse with PLI ACC vs PLI-Auto: PLI ACC supports making battery cells; PLI-Auto supports automobiles and auto components. Both are run by the Ministry of Heavy Industries.

Don’t confuse with PM E-DRIVE vs PLI ACC: PM E-DRIVE promotes EV adoption through demand-side support; PLI ACC is a supply-side manufacturing incentive.

Don’t confuse with PLI ACC vs FAME/PM E-DRIVE: PLI ACC subsidises domestic battery cell manufacturing; FAME and PM E-DRIVE support demand for electric vehicles.

Schemes: 52 Prelims questions since 2013, 10 in Prelims 2026 alone. They test features, the period and who funds it. In Mains, 33 news-triggered questions, mostly GS3.

Test yourself

Worth revising until Prelims 2027: most news questions come within two years of the event.

3

Scheme

PLI Scheme for Food Processing Industry (PLISFPI)

GS3 Economy · IndustryPrelims and Mains

Why in news
On 6 February 2026, the Minister of State for Food Processing Industries told the Rajya Sabha that 169 applications are approved under PLISFPI, with about ₹2,162.55 crore of incentive disbursed.
What it is
The PLI Scheme for Food Processing Industry (PLISFPI) gives incentives linked to incremental sales of food products made in India. It aims to build global food manufacturing champions, strengthen Indian brands abroad and raise farmers' incomes through value addition. It is run by the Ministry of Food Processing Industries.
Investment vs commitment
Beneficiaries reported investment above Rs 9,207 crore against a committed Rs 7,722 crore, nearly 20 percent more.
Sales and exports
Sales of PLI-supported products rose from Rs 58,758 crore in FY 2019-20 to Rs 1,08,854 crore in FY 2025-26 (CAGR 10.82 percent). Exports reached Rs 20,840 crore.
Jobs and tribal areas
About 3.35 lakh direct and indirect jobs were generated, and over Rs 3,265 crore was invested in notified tribal areas.
Millets
Sales of millet-based processed foods grew at a CAGR of 104 percent and millet procurement at 97 percent.
Working Groups
Two Working Groups will be set up: one to counter misleading perceptions of processed food, another to strengthen and promote the sector.
Implementing ministry
PLISFPI is a Central Sector scheme of the Ministry of Food Processing Industries.
Approvals
169 applications have been approved under the various categories of the scheme.
Branding abroad support
Applicants are reimbursed 50% of branding and marketing expenditure abroad, capped at the lower of 3% of annual food product sales or ₹50 crore a year.
Implementing agency
IFCI Limited has been appointed Project Management Agency to appraise proposals and scrutinise incentive claims.

Don’t confuse with PLISFPI vs PMKSY: PLISFPI gives incentives on incremental sales of manufacturers. PMKSY (Pradhan Mantri Kisan SAMPADA Yojana) funds infrastructure such as cold chains and processing units.

Schemes: 52 Prelims questions since 2013, 10 in Prelims 2026 alone. They test features, the period and who funds it. In Mains, 33 news-triggered questions, mostly GS3.

Test yourself

Worth revising until Prelims 2028: most news questions come within two years of the event.

4

Scheme

Khelo Bharat Niti 2025 (National Sports Policy)

GS2 Government policies and interventionsPrelims and Mains

Why in news
On 5 February 2026 (reply published 6 Feb), the Sports Minister told Rajya Sabha that Khelo Bharat Niti 2025, launched on 10 July 2025, guides sports promotion, with States holding primary responsibility.
What it is
Khelo Bharat Niti 2025 is India's National Sports Policy, launched in July 2025. It aims to build an inclusive, performance-driven sports ecosystem and links sports with education and community participation. It replaces the earlier national sports policy framework.
Vision
The vision is 'Sports for Nation Building', using sports for holistic national development.
Constitutional position
Sports is a State subject, so States and UTs carry primary responsibility; the Union supplements their efforts.
Inclusion focus
The policy targets the rural-urban gap, with access for women, persons with disabilities and economically weaker groups.
Evaluation
Union schemes are assessed through third-party evaluation under Department of Expenditure guidelines.
Nodal ministry
The policy is issued by the Ministry of Youth Affairs and Sports.

Don’t confuse with Khelo Bharat Niti vs Khelo India: Khelo Bharat Niti is a policy framework (2025); Khelo India is a Union scheme for sports infrastructure and talent, which operates under such policy.

Don’t confuse with National Sports Policy 2001: The 2001 policy was the earlier national sports policy; the 2025 Niti is the new one.

Schemes: 52 Prelims questions since 2013, 10 in Prelims 2026 alone. They test features, the period and who funds it. In Mains, 33 news-triggered questions, mostly GS3.

No practice question for this one; the card may still help an answer. Why: New national sports policy on a lasting topic; sports is a State subject. Few hard facts for a statement, so no question.

Worth revising until Prelims 2027: most news questions come within two years of the event.

5

Law and statutory body

Arbitration Council of India

GS2 Statutory bodiesGS3 EconomyPrelims and Mains

Why in news
On 6 February 2026, the Law Minister told the Lok Sabha that the Arbitration Council of India, provided for in 2019, has still not been constituted. He listed steps taken to promote institutional arbitration.
What it is
The Arbitration Council of India (ACI) is a statutory body provided for by Part IA of the Arbitration and Conciliation Act, 1996, inserted by the 2019 Amendment. It is meant to grade arbitral institutions and recognise bodies that accredit arbitrators. Its aim is to build a stronger institutional arbitration system in India.
Legal basis
Section 10 of the 2019 Amendment Act inserted Part IA into the 1996 Act to provide for the Council.
Strength
The Council is a seven-member body.
Status
The Council has not been constituted so far.
Amendment years
The 1996 Act was amended in 2015, 2019 and 2021 to promote India as an arbitration hub.
India International Arbitration Centre
It was set up under the India International Arbitration Centre Act, 2019, as an independent and autonomous body for institutional arbitration, including international commercial arbitration.
PSU adoption
In 2024-25, ONGC, GAIL and BPCL adopted the IIAC as the designated arbitral institution in their dispute clauses.

Don’t confuse with Arbitration Council of India vs India International Arbitration Centre: The ACI is a regulator-like body to grade institutions and accredit arbitrators, and is not yet constituted. The IIAC is an arbitral institution that already works and offers arbitration services.

Laws, judgments and statutory bodies: 30 Prelims questions since 2013 (what the law says, who chairs, legal basis). In Mains, 44 news-triggered questions, most in GS2, asking for provisions and challenges.

No practice question for this one; the card may still help an answer. Why: Statutory body under the 2019 amendment, still not constituted. Lasting topic; few news-linked questions on statutory bodies (7 in Prelims).

Worth revising until Prelims 2027: most news questions come within two years of the event.

6

Scheme

PANKHUDI Portal

GS2 Welfare schemesPrelims and Mains

Why in news
On 6 February 2026, the Women and Child Development Minister told Lok Sabha that 38 contributors had registered on the PANKHUDI portal as of 3 February 2026, and described the outreach done so far.
What it is
PANKHUDI is a single-window digital portal of the Ministry of Women and Child Development. Individuals, NGOs, Corporates and NRIs use it to offer help to women and child development work in a structured, transparent way. It links contributions to the Ministry's flagship missions.
Nature of portal
Single-window digital platform of MWCD for participation by individuals, NGOs, corporates and NRIs.
Type of contribution
The portal handles registration, proposal submission and tracking of contributions, and only non-cash contributions are covered.
Linked schemes
Contributions are aligned with Mission Saksham Anganwadi & Poshan 2.0, Mission Vatsalya and Mission Shakti, to promote convergence.
Capacity building
A Pankhudi module has been added to major courses of the Savitri Bai Phule National Institute of Women and Child Development (SPNIWCD).

Don’t confuse with Mission Shakti vs Mission Vatsalya: Mission Shakti covers women's safety and empowerment; Mission Vatsalya covers child protection.

Don’t confuse with Saksham Anganwadi & Poshan 2.0 vs Mission Vatsalya: Saksham Anganwadi & Poshan 2.0 deals with nutrition, early childhood care and education; Vatsalya deals with child protection.

Schemes: 52 Prelims questions since 2013, 10 in Prelims 2026 alone. They test features, the period and who funds it. In Mains, 33 news-triggered questions, mostly GS3.

No practice question for this one; the card may still help an answer. Why: New Women and Child Development portal for non-cash contributions; scheme-type items are 16% of Prelims questions, but facts here are thin.

Worth revising until Prelims 2027: most news questions come within two years of the event.

7

Law and statutory body

Protection of Children from Sexual Offences (POCSO) Act, 2012

GS2 Laws for vulnerable sectionsPrelims and Mains

Why in news
On 6 February 2026, the Women and Child Development Minister told Lok Sabha that the Government is keeping the age of consent at eighteen years under POCSO and other laws.
What it is
The POCSO Act, 2012 is a special law to protect children from sexual assault, harassment and pornography. It defines a child as anyone below eighteen and prescribes graded punishments. It is backed by the POCSO Rules, 2020, which set child-friendly procedures.
Definition of child
The Act treats any person below eighteen years as a child.
2019 amendment
The 2019 amendment made penalties harsher, including the death penalty for certain aggravated sexual offences against children.
Consent
The Act does not define consent. Any sexual act with a person under eighteen is an offence, even if consent was given.
POCSO Rules, 2020
The Ministry of Women and Child Development notified the Rules to strengthen implementation through child-friendly procedures.
International link
The child definition conforms to Article 1 of the UN Convention on the Rights of the Child.

Don’t confuse with POCSO Act vs Juvenile Justice Act, 2015: POCSO punishes sexual offences against children. The JJ Act deals with children in conflict with law and children in need of care and protection. Both use eighteen as the age limit.

Don’t confuse with Age of consent vs age of marriage: The age of consent for sexual acts is eighteen. The legal minimum age of marriage is a separate rule under the Prohibition of Child Marriage Act, 2006.

Laws, judgments and statutory bodies: 30 Prelims questions since 2013 (what the law says, who chairs, legal basis). In Mains, 44 news-triggered questions, most in GS2, asking for provisions and challenges.

No practice question for this one; the card may still help an answer. Why: Lasting law with age-of-consent debate; laws are 35 of 161 news-set Mains questions, but this reply is routine, so card only.

Worth revising until Prelims 2027: most news questions come within two years of the event.

8

Science and technology

GenomeIndia Project

GS3 BiotechnologyGS2 HealthPrelims and Mains

Why in news
On 6 February 2026, the Health Minister of State told the Lok Sabha in a written reply that GenomeIndia has completed a whole genome sequencing (WGS) database of over 10,000 Indians. He also listed other steps for personalised medicine.
What it is
GenomeIndia is a national project funded by the Department of Biotechnology to build a reference database of Indian genomes. It sequences whole genomes of people from varied population groups. The data is meant to support research on disease, diagnostics and treatment suited to Indians.
Scale of GenomeIndia
The project has completed a whole genome sequencing database of over 10,000 individuals from all major population groups in India.
Funding body
GenomeIndia is funded by the Department of Biotechnology.
NIDAN Kendras
NIDAN stands for National Inherited Disorders Administration Kendras. They are a component of DBT's UMMID initiative and offer prenatal testing, newborn screening and genetic counselling.
BioE3 Precision Biotherapeutics
Under the BioE3 Policy, DBT has named Precision Biotherapeutics as a thematic area, supporting indigenous mRNA therapeutics, monoclonal antibodies and cell and gene therapies.
InTGS
The Indian Tuberculosis Genomic Surveillance Consortium aims to catalogue drug resistance mutations in Mycobacterium tuberculosis using genomics and AI.

Don’t confuse with Whole genome sequencing vs exome sequencing: WGS reads the entire DNA of a person. Exome sequencing reads only the protein-coding regions.

Don’t confuse with Genome vs phenome: The genome is the full set of an organism's DNA. The phenome is the set of observable traits and clinical features. Phenome India links health and lifestyle data to genomic data.

Science and technology: 57 Prelims questions since 2013; most test the concept behind the news, not the news itself. In Mains, 12 news-triggered questions.

No practice question for this one; the card may still help an answer. Why: Lasting biotech topic: 10,000+ genomes sequenced, Phenome India biobank. Science and tech is 17% of Prelims, but release is a mixed list.

Worth revising until Prelims 2027: most news questions come within two years of the event.

9

Scheme

Tele-MANAS (National Tele Mental Health Programme)

GS2 Health · Mental healthPrelims and Mains

Why in news
On 6 February 2026, the Health Ministry told the Lok Sabha that 53 Tele-MANAS Cells now work in 36 States/UTs, and the helpline has handled over 32.84 lakh calls.
What it is
Tele-MANAS (Tele Mental Health Assistance and Networking Across States) is a national tele-counselling service for mental health, run through the toll-free helpline 14416. It gives free, confidential, 24x7, multilingual counselling and refers callers to specialist care where needed. It was launched on 10 October 2022 under the Ministry of Health and Family Welfare.
Launch
Tele-MANAS was launched on 10 October 2022, which is also World Mental Health Day.
Reach
47,75,644 calls received and 53 cells operational across all 36 States and UTs as of October 2026.
DMHP
The District Mental Health Programme is sanctioned in 767 districts with support under the National Health Mission; it is part of the National Mental Health Programme.
Primary care link
Mental health services are integrated into the Comprehensive Primary Health Care package at over 1.83 lakh Ayushman Arogya Mandirs.
Cells and coverage
As of 2 February 2026, 36 States/UTs have set up 53 Tele-MANAS Cells.
Mobile app
The app was launched on World Mental Health Day, 10 October 2024. It covers issues from well-being to mental disorders and has an interface for visually challenged users.
Armed Forces cell
A dedicated cell at AFMC Pune serves Armed Forces personnel and their dependents.
WHO assessment
WHO India published a Rapid Assessment Report on Tele-MANAS in 2024, covering reach, utilisation and user experience.

Don’t confuse with Tele-MANAS vs DMHP: Tele-MANAS is a national tele-counselling helpline (14416). DMHP is a district-based programme for outpatient, inpatient and outreach care under the National Mental Health Programme.

Don’t confuse with Tele-MANAS vs MANN Jaagriti: Tele-MANAS delivers counselling; MANN Jaagriti is a community awareness initiative for literacy and stigma reduction.

Don’t confuse with Tele-MANAS vs Tele-MANAS app: The helpline (audio, now also video) began in 2022. The mobile app came later, on 10 October 2024.

Don’t confuse with Tele-MANAS vs National Mental Health Programme: The National Mental Health Programme (1982) is the older, broader programme. Tele-MANAS is a 2022 tele-counselling service.

Schemes: 52 Prelims questions since 2013, 10 in Prelims 2026 alone. They test features, the period and who funds it. In Mains, 33 news-triggered questions, mostly GS3.

Test yourself

Worth revising until Prelims 2028: most news questions come within two years of the event.

10

Law and statutory body

Seeds Act, 1966 and SATHI Portal

GS3 Agriculture inputsPrelims and Mains

Why in news
On 6 February 2026, the Minister of State for Agriculture told the Rajya Sabha that the Seeds Act, 1966 and allied rules let States act against spurious seeds. He also cited the SATHI portal for seed traceability.
What it is
The Seeds Act, 1966 regulates the quality of seeds sold in India. The Seed Rules, 1968 and the Seeds (Control) Order, 1983 work with it, and the States enforce them through Seed Inspectors. SATHI is a portal for tracing seeds through the supply chain.
Enforcement by States
State Governments appoint Seed Inspectors. They inspect outlets, draw samples, cancel licences, seize stock, order stop-sale and prosecute.
SATHI portal
SATHI stands for Seed Authentication, Traceability & Holistic Inventory. It gives end-to-end digital traceability of seeds across the supply chain.
Seed dealer licence
A seed business needs a dealer licence under clause 3 of the Seeds (Control) Order, 1983, issued by the State Government.
Cotton seed price control
The Cotton Seeds Price (Control) Order, 2015 is issued under the Essential Commodities Act, 1955. It fixes the maximum sale price of Bt cotton seed every year.
Traceability
A nationwide traceability system is proposed. Each seed packet will carry a QR code showing its origin.
Registration
Every seed company must be registered, and unauthorised sellers will not be allowed to sell seeds.
Penalty
The old law allowed a penalty of up to ₹500. The proposal is a fine of up to ₹30 lakh.
Imprisonment
Deliberate production or sale of substandard seeds could attract up to three years in prison and a fine of up to ₹30 lakh.
Farmers' own seeds
Farmers can sow their own seeds and share them with other farmers. Traditional local seed exchange is not restricted.

Don’t confuse with Seeds Act vs PPV&FR Act: The Seeds Act, 1966 regulates the quality of seed sold. The PPV&FR Act, 2001 protects plant varieties and the rights of breeders and farmers.

Don’t confuse with Seeds Act, 1966 vs Seeds (Control) Order, 1983: The Act is the main law on seed quality. The Control Order, 1983 is subordinate legislation made under the Essential Commodities Act, 1955 that regulates seed sale and dealing.

Don’t confuse with Seed Act 2026 vs Seeds Act, 1966: The 2026 Act is only proposed. The 1966 Act is the law in force.

Laws, judgments and statutory bodies: 30 Prelims questions since 2013 (what the law says, who chairs, legal basis). In Mains, 44 news-triggered questions, most in GS2, asking for provisions and challenges.

No practice question for this one; the card may still help an answer. Why: Lasting law on seed quality with SATHI traceability portal; laws are 7% of Prelims, but this reply is routine.

Worth revising until Prelims 2027: most news questions come within two years of the event.

11

Scheme

Formation and Promotion of 10,000 FPOs Scheme

GS3 AgriculturePrelims and Mains

Why in news
On 6 February 2026, the Agriculture Ministry told the Rajya Sabha that 10,000 FPOs have been formed under the Central Sector FPO Scheme, with 21.96 lakh women farmers among its members (as on 1 January 2026).
What it is
The Formation and Promotion of 10,000 FPOs Scheme is a Central Sector Scheme of the Ministry of Agriculture and Farmers Welfare. It helps small and marginal farmers pool together into producer organisations to gain scale, market access and better bargaining power.
Target reached
10,000 FPOs have been formed and registered under the scheme.
Women-only FPOs
1,175 of the FPOs are registered with 100% women members.
Membership
As of 1 January 2026, 56.32 lakh farmers are registered, of whom 21.96 lakh are women.
Scheme type
It is a Central Sector Scheme, so the Centre funds it fully and it is run by the Ministry of Agriculture and Farmers Welfare.

Don’t confuse with Central Sector vs Centrally Sponsored Scheme: A Central Sector Scheme is wholly funded and run by the Centre. A Centrally Sponsored Scheme is shared with states under a funding pattern.

Schemes: 52 Prelims questions since 2013, 10 in Prelims 2026 alone. They test features, the period and who funds it. In Mains, 33 news-triggered questions, mostly GS3.

No practice question for this one; the card may still help an answer. Why: Scheme target of 10,000 FPOs reached, 1,175 all-women FPOs; possible scheme question but update is progress data.

Worth revising until Prelims 2027: most news questions come within two years of the event.

Quick facts

  • India sets up its first India Pavilion at the third World Defence Show, Saudi Arabia, 8-9 February 2026; the show is biennial.
  • DST launched the India-Netherlands Hydrogen Fellowship Programme; 19 IITs signed an MoU with the University of Groningen.
  • NSO launched a beta Model Context Protocol (MCP) server for the eSankhyiki portal, linking seven official datasets to AI tools.
  • FASTag Annual Pass, launched 15 August 2025, crossed 50 lakh users within six months.
  • India has signed DPI cooperation MoUs with 23 countries; UPI is live in over eight countries.
  • Agriculture Ministry signed an MoU with the Department of Posts on 7 January 2026 for traceable transport of seed, fertiliser and pesticide samples.
  • Agni-3 intermediate range ballistic missile was test-fired from Chandipur, Odisha on 6 February 2026 under Strategic Forces Command.
  • VOC Port Authority is the first Indian port to start an RF and radar-based anti-drone system.

Source: PIB, 6 Feb

What we left out: 71 of 90 releases
  • Speeches without a decision (8)
  • Routine company results (1)
  • Routine data (9)
  • Same issue as another release (24)
  • Ceremonies and campaigns (5)
  • Routine clarifications (1)
  • Routine scheme replies (5)
  • Routine replies (4)
  • Routine briefings (1)
  • Visits and meetings (3)
  • Routine drive tests (1)
  • Routine MoUs (1)
  • Routine meetings (1)
  • Conferences and speeches (1)
  • Routine tariff changes (1)
  • Project reviews (1)
  • Conferences and workshops (2)
  • Congratulatory messages (2)

Practise the day’s news

Mains question of the day

15 marks · 250 words

The Rajya Sabha was recently told of the key provisions of the Viksit Bharat – Guarantee for Rozgar and Ajeevika Mission (Gramin) Act, 2025, which provides 125 days of guaranteed wage employment and a Centrally Sponsored Scheme with 60:40 and 90:10 fund-sharing patterns. Examine its main provisions and discuss the challenges in implementing it, especially for State finances and planning through Gram Sabhas.

From: Viksit Bharat – Guarantee for Rozgar and Aajeevika Mission (Gramin) Act, 2025 (VB-G RAM G)

Write and get it marked

Keep reading

All days