All days

UPSC current affairs · Thursday

Current Affairs, 19 March 2026

11 issues picked from 82 PIB releases · about 2 minutes each · written by UPSC Grade, each fact checked against its PIB release or by a second model

How to readRead “Why in news” and “What it is” for every issue. Open For Prelims or For Mains for the exam you’re preparing for, then Test yourself at the foot of each card. Half the news questions in Prelims are answered from background, not the news itself.

In 60 seconds

  1. Export Promotion Mission (EPM). RELIEF gives ECGC-backed risk cover and MSME reimbursement to exporters hit by Gulf shipping disruption.
  2. PM-KISAN. 22nd PM-KISAN instalment of ₹18,640 crore reaches 9.32 crore farmers via DBT.
  3. Fisheries and Aquaculture Infrastructure Development Fund (FIDF). FIDF has approved 228 fisheries infrastructure projects worth Rs 5,559.54 crore; 68 are complete, Rajya Sabha told.
  4. Jal Jeevan Mission and Jal Arpan. JJM tap coverage reached 81.71% of rural homes; the next phase targets O&M and community participation.
  5. Board of Trade and BHAVYA Industrial Parks Scheme. NICDC will implement BHAVYA scheme to build 100 plug-and-play industrial parks across India.
  6. National Waterways and Inland Waterways Transport. Government lists 20 National Waterways to be made operational by 2030-31, starting with six in 2026-27.
  7. MATSYA-6000 and Deep-Sea Mining. MATSYA-6000 dive awaits a faulty foam part; seabed commercial mining rules still pending.
  8. BioE3 Policy. India's bioeconomy reached $195.3 billion in 2025, about 4.8% of GDP; target is $300 billion by 2030.
  9. Postal Ballot under Section 60(c), Representation of the People Act, 1951. ECI extends postal ballot to 85+, PwD, essential-service and service voters for 2026 Assembly polls.
  10. India's Non-Fossil Capacity and NDC Targets. India says it met its 50% non-fossil NDC early and released a grid plan for 900 GW.
  11. NITI Aayog Report on Sports Equipment Manufacturing Exports. NITI Aayog roadmap seeks to lift India's sports equipment exports from $275 million to $8.1 billion by 2036.
1

Scheme

Export Promotion Mission (EPM)

GS3 Economy, external sectorPrelims and Mains

Why in news
On 19 March 2026 the Government approved RELIEF, a time-bound intervention under the Export Promotion Mission, to help exporters hit by West Asia shipping disruptions. It has an outlay of Rs 497 crore.
What it is
The Export Promotion Mission (EPM) is a Commerce Ministry mission that bundles financial and non-financial support for exporters into one framework. It is run through DGFT with Export Promotion Councils and industry bodies as partners. It covers areas such as export credit, factoring, warehousing and logistics, certification, trade intelligence and market access.
Rollout status
Ten EPM interventions are already rolled out. The branding component is still under stakeholder consultation.
Interest subvention
After industry feedback, interest subvention was extended to small and micro exporters on identified tariff lines.
Committee schedule
The Norms Committee, Policy Relaxation Committee, EPCG Committee and Exim Facilitation Committees will meet fortnightly. The SCOMET inter-ministerial group meets monthly.
District Export Hubs drive
A 90-day activation drive for District Export Hubs began on 1 June 2026, using District Export Promotion Committees and District Export Action Plans.
Implementing agency
DGFT, under the Ministry of Commerce and Industry, is the main agency for foreign trade policy and facilitation.
EPM period
The Export Promotion Mission is approved for FY 2025-26 to FY 2030-31, aimed at export competitiveness, especially for MSMEs.
RELIEF outlay
RELIEF has a financial outlay of Rs 497 crore under EPM, to support exporters amid West Asia logistics disruptions.
Cover for already insured consignments
Exporters with ECGC cover for eligible consignments get up to 100% risk coverage over and above existing cover, for 14 Feb to 15 Mar 2026.
Support for upcoming consignments
For 16 Mar to 15 Jun 2026, exporters are encouraged to take ECGC cover, with Government support for up to 95% risk coverage over existing cover.
Reimbursement for non-insured MSMEs
Eligible MSME exporters without ECGC insurance get partial reimbursement of up to 50% of freight and insurance surcharge burden, capped at Rs 50 lakh per exporter.
Two sub-schemes
EPM has NIRYAT PROTSAHAN for trade finance (interest subvention, factoring, collateral guarantees) and NIRYAT DISHA for other enablers (quality, branding, market access, logistics, trade intelligence).
Nodal agency
ECGC Ltd, wholly owned by the Government of India under the Commerce Ministry, verifies claims, pays out and monitors RELIEF.
Outlay
RELIEF has an approved outlay of Rs 497 crore, funded under EPM.
Cover for existing ECGC policyholders
Exporters with ECGC cover get up to 100% extra risk coverage for consignments from 14 Feb to 15 Mar 2026.
Cover for future shipments
For consignments from 16 Mar to 15 Jun 2026, government support covers up to 95% risk coverage over existing ECGC cover.
MSME reimbursement
Non-ECGC-insured MSME exporters can get up to 50% partial reimbursement of freight and insurance surcharges, capped at Rs 50 lakh per exporter.
Review
The EPM Steering Committee will review RELIEF periodically and may modify, continue or withdraw it.
Approval and outlay
The Government approved EPM in November 2025. Its outlay is ₹25,060 crore for FY 2025-26 to FY 2030-31.
LIFT
LIFT supports hinterland exporters on transport costs. It covers up to 30% of the cost, capped at ₹20 lakh per exporter per year.
Two verticals
EPM combines financial support under Niryat Protsahan with trade ecosystem support under Niryat Disha, in a digitally monitored framework.
TRACE
Reimburses 60% (Positive List) or 75% (Priority Positive List) of testing, inspection and certification costs, up to ₹25 lakh per IEC a year.
Status
With this launch, 10 of the 11 proposed EPM interventions are operational.
Implementing ministries
Jointly implemented by the Department of Commerce, Ministry of MSME and Ministry of Finance.
Collateral guarantee
Offered with CGTMSE: cover up to 85% for Micro and Small exporters, 65% for Medium, with max guaranteed exposure of ₹10 crore per exporter per year.

Don’t confuse with EPC vs DGFT: Export Promotion Councils are industry-facing bodies of exporters that promote specific sectors. DGFT is the government office that administers foreign trade policy.

Don’t confuse with EPCG vs EPC: EPCG is the Export Promotion Capital Goods scheme allowing concessional duty on capital goods imports. EPC is a Council of exporters.

Don’t confuse with NIRYAT PROTSAHAN vs NIRYAT DISHA: PROTSAHAN deals with trade finance; DISHA covers non-financial enablers such as compliance, branding, market access, logistics and trade intelligence.

Don’t confuse with ECGC cover vs RELIEF support: ECGC is the credit insurer; RELIEF is a Government intervention that adds cover on top of ECGC's existing cover or reimburses costs for uninsured MSMEs.

Don’t confuse with ECGC vs EXIM Bank: ECGC insures exporters against non-payment and political risk. EXIM Bank is a financial institution that lends for trade.

Don’t confuse with RELIEF vs EPM: EPM is the umbrella mission. RELIEF is one time-bound intervention under it.

Don’t confuse with EPM vs earlier schemes: EPM replaces earlier schemes such as the Interest Equalisation Scheme and the Market Access Initiative, whose arrears are being cleared under it.

Schemes: 52 Prelims questions since 2013, 10 in Prelims 2026 alone. They test features, the period and who funds it. In Mains, 33 news-triggered questions, mostly GS3.

Test yourselfMains

Worth revising until Prelims 2028: most news questions come within two years of the event.

2

Scheme

PM-KISAN

GS3 Agriculture - Farmer supportGS2 Welfare schemesPrelims and Mains

Why in news
On 13 March 2026, the Prime Minister released the 22nd PM-KISAN instalment of over ₹18,640 crore to about 9.32 crore farmers from Guwahati, Assam (PIB release, 19 March 2026).
What it is
PM-KISAN (Pradhan Mantri Kisan Samman Nidhi) is an income support scheme for landholding farmer families, launched on 24 February 2019. It gives ₹6,000 a year in three equal instalments of ₹2,000 through Direct Benefit Transfer to Aadhaar-seeded bank accounts. It is a Central Sector scheme fully funded by the Centre, with States identifying beneficiaries.
Who identifies beneficiaries
State Governments identify eligible farmer households and build the beneficiary database.
Exclusions and recovery
Income tax payers, government employees, PSU personnel and holders of constitutional posts are ineligible; recovery is done from them.
Monitoring
The national-level review mechanism is chaired by the Cabinet Secretary, with State and District Monitoring Committees below it.
Cumulative disbursal
More than ₹4.47 lakh crore was disbursed through the first 23 instalments.
Mode of payment
Support reaches eligible farmer families through Direct Benefit Transfer.
Agriculture Infrastructure Fund
Under the AIF, about ₹1.75 lakh crore has been invested across more than 2.28 lakh projects.
Scheme type and funding
PM-KISAN is a Central Sector scheme, fully funded by the Centre. It pays ₹6,000 a year in three instalments.
Benefit
Eligible landholding farmer families get Rs.6,000 a year in three equal instalments, paid into bank accounts.
Launch
The scheme was launched in February 2019.
Disbursal so far
Over Rs.4.47 lakh crore has been transferred through 23 instalments.
Women beneficiaries
Women farmers received over Rs.1.06 lakh crore, nearly one in four beneficiaries.
Funding
PM-KISAN is a Central Sector scheme, funded 100% by the Centre.
Cumulative payout
Total disbursement since the 24 February 2019 launch will exceed Rs 4.46 lakh crore.
Funding and type
PM-KISAN is a Central Sector scheme, fully funded by the Centre. It pays Rs 6,000 a year in three instalments by DBT.
Payment
Each eligible family gets ₹6,000 a year in three equal instalments of ₹2,000, paid into Aadhaar-seeded bank accounts.
Role of States
States identify eligible households and build the beneficiary database. They must also start recovery where ineligible people were paid.
Budget 2026-27
The Union Budget 2026-27 allocated ₹60,000 crore to the scheme.
Voluntary Surrender
A facility lets affluent farmers give up the benefit; accounts surrendered by mistake can be reactivated.

Don’t confuse with Central Sector vs Centrally Sponsored: Central Sector schemes are 100% Centre-funded; Centrally Sponsored schemes share costs with States. The release calls PM-KISAN centrally sponsored, but it is a Central Sector scheme.

Don’t confuse with PM-KISAN vs PM Fasal Bima Yojana: PM-KISAN gives income support. PMFBY is crop insurance for risk protection.

Don’t confuse with PM-KISAN vs PMFBY: PM-KISAN is cash income support; PMFBY is crop insurance against losses.

Schemes: 52 Prelims questions since 2013, 10 in Prelims 2026 alone. They test features, the period and who funds it. In Mains, 33 news-triggered questions, mostly GS3.

Test yourself

Worth revising until Prelims 2028: most news questions come within two years of the event.

3

Scheme

Fisheries and Aquaculture Infrastructure Development Fund (FIDF)

GS3 AgriculturePrelims and Mains

Why in news
On 19 March 2026, the Fisheries Minister told the Rajya Sabha that FIDF has approved 228 projects worth Rs 5559.54 crore, with 68 completed.
What it is
FIDF is a Department of Fisheries fund that has run since 2018-19 with a total size of Rs 7522.48 crore. It gives concessional finance, backed by interest subvention, to States, UTs, State entities and other stakeholders. The money builds harbours, landing centres, hatcheries, cold chains and similar facilities.
Fund size and start
FIDF has a total fund size of Rs 7522.48 crore and has been implemented from 2018-19.
Interest subvention
The Department gives interest subvention up to 3% a year. Nodal Loaning Entities lend at a rate not lower than 5% a year.
Who can borrow
Eligible Entities include State Governments/UTs, State entities and other stakeholders.
Link with PMMSY
FIDF is an enabling financial mechanism for infrastructure. PMMSY gives developmental support.
Start and size
FIDF has run since 2018-19 with a total fund size of Rs 7522.48 crore.
Progress
228 proposals were approved at Rs 5559.54 crore, with the cost eligible for subvention capped at Rs 4351.86 crore.
Intended outcomes
The infrastructure aims to cut post-harvest losses, raise production and productivity, add value and improve marketing.

Don’t confuse with FIDF vs PMMSY: FIDF gives concessional loans with interest subvention for infrastructure. PMMSY gives developmental support for the sector.

Schemes: 52 Prelims questions since 2013, 10 in Prelims 2026 alone. They test features, the period and who funds it. In Mains, 33 news-triggered questions, mostly GS3.

Test yourself

Worth revising until Prelims 2027: most news questions come within two years of the event.

4

Scheme

Jal Jeevan Mission and Jal Arpan

GS2 Welfare schemesGS3 Rural water supplyPrelims and Mains

Why in news
On 19 March 2026, the Minister of State for Jal Shakti told Lok Sabha that about 15.82 crore rural households (81.71%) now have tap water under Jal Jeevan Mission. The reply also set out the extended phase, the 2024 functionality assessment and the 2026-27 budget proposal.
What it is
Jal Jeevan Mission is the Centre's flagship scheme, run by the Department of Drinking Water and Sanitation under the Ministry of Jal Shakti, to give every rural household a tap water connection. Jal Arpan is a reform under it: the formal handover of completed water supply schemes to Gram Panchayats and Village Water and Sanitation Committees for operation and maintenance.
Jal Arpan
Formal handover of completed rural water supply schemes to Gram Panchayats and VWSCs, after a prescribed trial run period.
Coverage
More than 15.96 crore rural households, over 82% of rural households, have tap connections.
Jal Arpan module
Developed by the Department of Drinking Water & Sanitation; keeps a digital record of scheme handover.
Sujalam Bharat
Geotagging of water supply assets and sources under JJM 2.0 to build a digital inventory.
Launch
Jal Jeevan Mission was launched in August 2019 with the target of tap water to all rural households by 2024.
Summit dates and venue
The first Departmental Summit is on 1-2 September 2026 at Sushma Swaraj Bhawan, New Delhi.
Purpose of the summit model
It is a new platform to strengthen cooperative federalism through Centre-State collaboration. It is the first of a series of such summits.
Four thematic pillars
Timely implementation of water infrastructure projects, Jal Sanchay Jan Bhagidari-Catch the Rain, source sustainability of drinking water, and operation and maintenance of rural water supply under Jal Jeevan Mission 2.0.
Who attends
Political leaders and senior officials from the Union and State Governments take part.
Outcome presentation
States will present outcomes and action plans to the Prime Minister in the valedictory session.
Nodal ministry
Jal Jeevan Mission is implemented by the Ministry of Jal Shakti.
JJM 2.0 approval
JJM 2.0 was approved on 10 March 2026. Its strategy centres on source sustainability, groundwater recharge and greywater management.
Water security in the VB-G RAM G Act
The VB-G RAM G Act, 2025 names water security as one of its four thematic focus areas.
SBM(G) 2.0 focus
SBM(G) 2.0 focuses on scientific management of solid and liquid waste.
Planning vehicle
Convergence is to be done through Viksit Gram Panchayat Plans, aligned with Village Action Plans under JJM 2.0 and SBM-G 2.0.
Geo-tagging and tools
Works must be registered and geo-tagged on the Viksit Bharat National Rural Infrastructure Stack. States are to use tools such as Yuktdhara, water budgeting and hydrogeological assessments.
Institutional step
The officer in charge of Rural Water Supply or the Public Health Engineering Department is to join the State-level Steering Committee under the Act.
Launch and aim
Launched on 15 August 2019 to give every rural household a functional tap connection on a regular, long-term basis.
Service standard
The Mission targets 55 litres per capita per day of water meeting the BIS 10500 standard, at affordable service charges.
Har Ghar Jal certification
188 districts, 1,090 blocks, 1.01 lakh Gram Panchayats and 2.04 lakh villages are certified Har Ghar Jal.
Extension
The Union Government has extended the Mission till December 2028.
Signatories
MoUs were signed with four States (Arunachal Pradesh, Jharkhand, Tamil Nadu, Nagaland) and one UT (Puducherry).
Model mandated
The MoU requires a Gram Panchayat-led, service-based and community-centred model of rural water governance.
JJM 2.0 priorities
Focus is on sustaining infrastructure, tap functionality, water quality, source sustainability, O&M, community ownership and regular monitoring.
Institutions
Collectors are to hold regular District Water and Sanitation Mission meetings, which help prepare Village Action Plans and certify Panchayats as capable institutions.
Conditions before fund release
States must sign the MoU, get schemes validated against the Sujalam Bharat GIS-linked Asset Registry, certify compliance with CPHEEO design norms, and reconcile expenditure financially.
Jal Utsav
A three-tier annual community campaign: Jal Mahotsav nationally, Rajya Jal Utsav or Nadi Utsav in States, and Lok Jal Utsav at Gram Panchayat level.
MoU count
Meghalaya is the twelfth State to sign a Reform-Linked MoU under JJM 2.0.
Cabinet approval
JJM 2.0 was approved by the Union Cabinet on 10 March 2026.
Extended deadline
The original deadline of May 2024 has been extended to December 2028.
Outlay
The Cabinet approved an additional outlay of ₹1.51 lakh crore for the Mission.
Local role
Gram Panchayats and VWSCs are to manage and operate in-village water supply systems; District Water Sanitation Missions prepare village action plans and issue panchayat certifications.
Implementing ministry
JJM is implemented by the Department of Drinking Water and Sanitation, Ministry of Jal Shakti.
Jal Mahotsav 2026
A 15-day nationwide campaign from 8 March (International Women's Day) to 22 March (World Water Day), with Jal Arpan of assets to Gram Panchayats.
Key reform areas
Assured service delivery with defined performance standards, clear accountability at State, district and Gram Panchayat levels, and long-term sustainability through source protection.
Implementing body
JJM is implemented by the Department of Drinking Water and Sanitation, Ministry of Jal Shakti, jointly with States.
New end date
The Mission is extended up to December 2028 with a higher financial outlay.
MoU model
The MoU mandates a Gram Panchayat-led, service-based, community-centred model of rural water governance.
Implementing department
The Mission is run by the Department of Drinking Water and Sanitation under the Ministry of Jal Shakti, through the National Jal Jeevan Mission.
Original launch
JJM was launched in 2019 with the aim of tap water to every rural household by 2024.
Funding pattern
JJM is a centrally sponsored scheme; the Centre-State share is 90:10 for Himalayan and North-Eastern States, 50:50 for other States.
Start and aim
Running since August 2019, JJM aims at assured tap water to every rural household in partnership with States.
Extended phase
The extended phase focuses on infrastructure quality and O&M through Jan Bhagidhari, with separate MoUs signed with States/UTs.
Functionality assessment 2024
An independent third-party assessment found 76% of household tap connections functional, judged on quantity, quality and regularity.
Federal division
Drinking water is a state subject; States handle planning, approval, implementation and O&M, and the Centre gives technical and financial help.
Reform areas in MoU
The reform-linked MoU covers 11 structural reform areas, including institutional architecture, service utility framework, water quality governance and source sustainability.
Jal Arpan condition
A key MoU condition is that completed piped schemes be handed over to Gram Panchayats/VWSCs and the community through Jal Arpan.
Decision Support System
The MoU provides for the DSS platform, developed by DDWS, as a digital planning tool at district and GP levels for source sustainability, integrated with Sujalam Bharat and national water datasets.
Mission extension
JJM has been extended till December 2028 with an enhanced outlay.
Reform areas
The MoU covers 11 structural reform areas, such as service utility framework, water quality governance and source sustainability.
Sujal Gaon ID
A scheme-based unique digital identifier for mapping rural piped water supply assets. 1.64 lakh IDs are created across 31 States/UTs, linked to 67,000 Sujalam Bharat IDs.
Conditions for central funds
Central funds depend on four requirements: signing the MoU, creating Sujal Gaon IDs, timely financial reconciliation, and notifying State O&M policies.
Funding modes
Upfront payment, reimbursement and Viability Gap Funding (for annuity-based PPP models in BWSs). No central help for retrofitting schemes.
Har Ghar Jal declaration
A Gram Panchayat can declare itself Har Ghar Jal only after the State has set up adequate in-village operation and maintenance mechanisms.
Target and MoUs
All 19.36 crore rural households are to get tap connections by December 2028, with separate MoUs with States/UTs.
Water quality standard
BIS:10500 is the benchmark for water supplied under JJM; arsenic and fluoride affected habitations get priority.
Quality monitoring funds
States/UTs can use up to 2% of their annual JJM allocation for water quality monitoring and surveillance.
Nal Jal Mitra
Nal Jal Mitra Programme, run with the Ministry of Skill Development and Entrepreneurship, trains villagers as scheme operators and for minor repairs.
Implementing agency
The scheme is run by the Ministry of Jal Shakti through its Department of Drinking Water and Sanitation.

Don’t confuse with Jal Jeevan Mission vs Atal Mission for Rejuvenation and Urban Transformation (AMRUT): JJM targets rural household tap connections; AMRUT covers urban water supply and sewerage.

Don’t confuse with Jal Jeevan Mission vs Swachh Bharat Mission (Grameen): JJM is for drinking water supply; SBM-G is for sanitation. Both run under the Department of Drinking Water and Sanitation.

Don’t confuse with Jal Arpan vs Jal Sanchay Jan Bhagidari: Jal Arpan hands over completed water supply schemes to local bodies for operation and maintenance. Jal Sanchay Jan Bhagidari is a community-participation drive on water conservation and rainwater harvesting.

Don’t confuse with JJM vs SBM(G): JJM provides tap water to rural homes. SBM(G) deals with rural sanitation and waste management. Both are run by DDWS.

Don’t confuse with Jal Arpan vs JJM: Jal Arpan is only the handover of completed schemes for operation and maintenance. JJM is the whole mission.

Don’t confuse with Jal Jeevan Mission vs Jal Jal Shakti Abhiyan: JJM provides household tap connections in rural areas. Jal Shakti Abhiyan is a water conservation and rainwater harvesting campaign.

Don’t confuse with JJM vs Swajaldhara/NRDWP: Earlier programmes such as Swajaldhara and NRDWP focused on habitation-level coverage; JJM targets household tap service delivery.

Don’t confuse with Jal Arpan vs Jal Sankalp: Jal Arpan is the formal handover of water assets to Gram Panchayats. Jal Sankalp is Arunachal Pradesh's gap-funding effort for source sustainability.

Don’t confuse with Jal Arpan vs Jal Utsav: Jal Arpan is the commissioning and formal handover of schemes to Gram Panchayats and VWSCs. Jal Utsav is an annual community campaign for maintenance and review.

Don’t confuse with Sujalam Bharat vs Meri Panchayat: Sujalam Bharat is the digital asset and service-area mapping framework. Meri Panchayat is the application that reflects citizen feedback from Jal Seva Aankalan.

Don’t confuse with Jal Jeevan Mission vs Jal Sanchay: JJM provides tap water to rural homes; Jal Sanchay is the water conservation push that supports source sustainability.

Don’t confuse with Jal Jeevan Mission vs AMRUT: JJM covers rural households; AMRUT focuses on urban water supply and sewerage.

Don’t confuse with Jal Arpan vs Jal Mahotsav: Jal Arpan is the handover of water assets to local bodies; Jal Mahotsav is a community campaign during which such handovers were held.

Don’t confuse with Jal Jeevan Mission vs Jal Shakti Abhiyan: JJM is a tap connection scheme; Jal Shakti Abhiyan is a water conservation campaign.

Don’t confuse with Jal Shakti Abhiyan vs Jal Jeevan Mission: Jal Shakti Abhiyan: Catch the Rain is a water conservation campaign for source sustainability; JJM is the tap connection scheme.

Don’t confuse with Jal Seva Aankalan vs Jal Arpan: Jal Seva Aankalan records service delivery responses at GP level. Jal Arpan is the handover of schemes.

Don’t confuse with Sujal Gaon ID vs Sujalam Bharat ID: Sujal Gaon ID identifies a scheme. Each Sujalam Bharat ID combines a scheme's infrastructure ID and service area ID, and Sujalam Bharat is the wider national digital architecture.

Don’t confuse with Jal Jeevan Mission vs Jal Arpan: JJM is the overall scheme for rural tap connections; Jal Arpan is a reform under it for handing over completed schemes to GPs/VWSCs.

Don’t confuse with JJM vs Swachh Bharat Mission (Gramin): JJM provides piped drinking water; SBM (Gramin) is the sanitation programme, with which JJM converges for grey-water reuse.

Schemes: 52 Prelims questions since 2013, 10 in Prelims 2026 alone. They test features, the period and who funds it. In Mains, 33 news-triggered questions, mostly GS3.

Test yourself

Worth revising until Prelims 2028: most news questions come within two years of the event.

5

Economy

Board of Trade and BHAVYA Industrial Parks Scheme

GS3 Economy: Trade and industryPrelims and Mains

Why in news
On 19 March 2026, the Commerce Ministry said NICDC will anchor implementation of the BHAVYA scheme to develop 100 plug-and-play industrial parks under the National Industrial Corridor Development Programme.
What it is
The Board of Trade is the apex consultative body of the Department of Commerce. It brings together the Centre, States, Export Promotion Councils and industry to discuss trade policy. The BHAVYA Industrial Parks Scheme funds the development of industrial parks, with States taking part through rounds of selection.
Board of Trade
It is the apex consultative platform of the Department of Commerce, chaired by the Commerce Minister. Members include States, Export Promotion Councils, industry chambers and non-official members.
BHAVYA scheme
The scheme has an outlay of ₹33,660 crore to develop 100 industrial parks. Its first round is currently open to States.
USD 1 trillion target
The target is about USD 530 billion in merchandise and USD 470 billion in services exports.
DGTR
The Directorate General of Trade Remedies can recommend anti-dumping and safeguard measures for industries hurt by dumping or predatory pricing. It runs outreach such as Jan Sunwai.
Aim and outlay
Cabinet approved the scheme with an outlay of ₹33,660 crore to build 100 industrial parks over six years.
Implementing agency
NICDC is the Project Management Agency, responsible for implementation and monitoring, and built the BHAVYA Portal.
Centre-State model
States provide the land. The Centre supports infrastructure through NICDC, which partners with States under a 51:49 model.
Park sizes
Parks start at 25 acres in hilly areas, smaller UTs and the Northeast, run to 100-500 acres in mid-sized States, and reach up to 1,000 acres near cities.
Selection phases
Applications from 1 June to 31 July are considered for the first 20 parks. A further 30 parks follow from applications up to 30 September.
Portal function
The portal handles DPR submission, appraisal and real-time monitoring, and supports the challenge-based selection.
Scale and period
100 industrial parks over six years, 2026-27 to 2031-32, with an outlay of about ₹33,660 crore.
First phase
Up to 50 parks will be taken up through a challenge-based competitive selection.
Implementation vehicle
Projects are executed by SPVs incorporated under the Companies Act, 2013.
Funding form and agency
Assistance is equity contribution linked to the value of land transferred to the SPV and to milestones. NICDC is the Project Management Agency.
Oversight
The National Level Steering Committee is chaired by the Secretary, DPIIT; GIS-based monitoring is used.
Target
BHAVYA aims at 100 plug-and-play industrial parks.
Park features
Parks have pre-approved land, ready infrastructure, integrated services and single-window systems.
Link to PM GatiShakti
Parks are aligned with the PM GatiShakti National Master Plan, focusing on multimodal connectivity and last-mile access.
NICDC's current work
NICDC is implementing 20 projects across 13 states and is Project Management Agency for seven PM MITRA Parks.
Outlay and target
Rs.33,660 crore for developing 100 plug-and-play industrial parks.
External infrastructure
Support for external connectivity infrastructure up to 25% of project cost.
Selection
Projects are chosen through challenge mode, favouring reform-oriented, investment-ready proposals.
Design principles
Parks follow PM GatiShakti principles and use underground utility corridors (no-dig environment).
NICDC
NICDC under DPIIT is implementing 20 projects across 13 states.

Don’t confuse with Export Promotion Mission vs Districts as Export Hubs: The Mission is a ₹25,000 crore financial support scheme for exporters. Districts as Export Hubs is an initiative to build export capacity at district level, now with a 90-day drive in 120 districts.

Don’t confuse with Anti-dumping duty vs safeguard duty: Anti-dumping duty counters unfairly priced imports from specific countries. Safeguard duty counters a sudden import surge, whatever the source, and needs no unfair practice.

Don’t confuse with BHAVYA vs Board of Trade: BHAVYA is an industrial parks scheme. The Board of Trade is a consultative body on trade policy under the Department of Commerce.

Don’t confuse with DPIIT vs NICDC: DPIIT issued the operational guidelines. NICDC is the Project Management Agency that implements and monitors the scheme.

Don’t confuse with NICDC vs DPIIT: DPIIT is the ministry department that frames the scheme; NICDC is the agency that manages and monitors it.

Don’t confuse with BHAVYA vs PM MITRA: BHAVYA covers 100 general industrial parks via NICDC; PM MITRA parks are textile-specific under the Ministry of Textiles, with NICDC as project management agency.

Don’t confuse with NICDC vs NICDP: NICDC is the company implementing; NICDP is the programme for industrial corridors.

Don’t confuse with BHAVYA vs NICDP: NICDP builds greenfield Industrial Smart Cities along corridors through NICDC; BHAVYA funds plug-and-play parks in all States through challenge mode.

Economy terms and data: 42 Prelims questions since 2013, rising in recent years; they test what a term or instrument means. In Mains, 12 news-triggered questions.

Test yourself

Worth revising until Prelims 2028: most news questions come within two years of the event.

6

In the news

National Waterways and Inland Waterways Transport

GS3 InfrastructurePrelims and Mains

Why in news
On 19 March 2026, the Shipping Ministry told the Rajya Sabha which new National Waterways will become operational over the next five years, in three phases from 2026-27 to 2030-31.
What it is
National Waterways are inland waterways declared by Parliament under the National Waterways Act, 2016, which lists 111 waterways. The Inland Waterways Authority of India (IWAI) develops and regulates them for shipping and navigation. A declared waterway is not always operational; it needs surveys, fairway development and terminals first.
Operational waterways
As of March 2026, 32 National Waterways spanning 5,155 km are operational; the number is proposed to rise to 52 in five years.
IWAI Act, 1985
This Act created the Inland Waterways Authority of India to develop and regulate inland waterways for shipping and navigation.
Cargo record
Cargo on National Waterways reached 145.84 million tonnes in FY 2024-25.
Legal basis
The National Waterways Act, 2016 declared 111 National Waterways, replacing the earlier five.
Sites
Lighthouses will be at Bogibeel, Pandu, Silghat and Biswanath Ghat. Biswanath Ghat is the only one on the north bank.
NW-2 length
NW-2 runs from Dhubri to Sadiya over 891 km, the longest navigable stretch of any Indian waterway, as per the release.
DGLL
DGLL is the statutory authority for aids to navigation along India's 11,098 km coastline and now inland waterways.
Institutional steps
IWAI and DGLL signed an MoU on 8 April 2025. Sites were transferred to DGLL under Right of Use agreements in June 2025.
NW-1
NW-1 on the Ganga (Haldia-Prayagraj) was the first national waterway, declared in 1986.
IWDC 3.0
The third council meeting was held in Kochi and chaired by Union Minister Sarbananda Sonowal. It follows IWDC 1.0 in 2024 and IWDC 2.0 in 2025.
Growth in cargo and waterways
Cargo on national waterways rose from 18 million tonnes in 2013-14 to 145.84 million tonnes in 2024-25. Operational waterways rose from 3 to 32.
Number of national waterways
There are 111 national waterways across 23 states and four union territories. IWAI under the Ministry of Ports, Shipping and Waterways is the nodal agency.
Jal Vahak scheme
The cargo promotion scheme reimburses up to 35% of operating expenditure on cargo moved by inland waterways. It is valid initially for three years and is being explored for other waterways including Kerala.

Don’t confuse with IWAI Act, 1985 vs National Waterways Act, 2016: The 1985 Act set up IWAI; the 2016 Act declares the 111 National Waterways.

Don’t confuse with Operational vs declared waterways: 111 are declared as National Waterways, but only 32 are operational with fairway, terminals and navigational aids.

Don’t confuse with Declared vs operational: Declaring a waterway as national (by Parliament) is different from making it operational (by IWAI with infrastructure and cargo movement).

Don’t confuse with NW-1 vs NW-2 vs NW-3: NW-1 is the Ganga (Haldia-Prayagraj), NW-2 the Brahmaputra (Dhubri-Sadiya), NW-3 the West Coast Canal (Kollam-Kottapuram).

Don’t confuse with IWAI vs DGLL: IWAI develops and regulates national waterways; DGLL provides aids to navigation such as lighthouses. Both are under the Ministry of Ports, Shipping and Waterways.

Don’t confuse with IWAI vs IWDC: IWAI is the statutory authority that develops and regulates national waterways. IWDC is a Centre-State council that reviews projects and coordination.

Don’t confuse with NW-2 vs NW-1: NW-2 is the Brahmaputra (Sadiya to Dhubri). NW-1 is the Ganga (Haldia to Prayagraj).

Test yourself

Worth revising until Prelims 2027: most news questions come within two years of the event.

7

Science and technology

MATSYA-6000 and Deep-Sea Mining

GS3 Science and TechnologyGS3 EconomyPrelims and Mains

Why in news
On 19 March 2026, the Earth Sciences Minister told Rajya Sabha that MATSYA-6000's 500 m shallow-water dive is delayed because a European-made syntactic foam component is defective. He also said the International Seabed Authority has not yet framed the Exploitation Code for commercial mining.
What it is
MATSYA-6000 is India's crewed deep-ocean submersible under the Deep Ocean Mission, built by the National Institute of Ocean Technology (NIOT), Chennai. It is meant to carry people to 6,000 m depth. Deep-sea mining targets polymetallic nodules on the seabed, which hold metals such as nickel, cobalt, copper and manganese.
Foam source
India designs the foam, but a designated firm in Europe makes it.
Exploitation Code
Commercial mining is governed by the Exploitation Code, which the International Seabed Authority has not yet developed.
International Seabed Authority
The ISA is an UNCLOS body based in Kingston, Jamaica. It regulates mineral activity in the seabed beyond national jurisdiction (the Area).
Deep Ocean Mission
Matsya-6000 is part of the Deep Ocean Mission of the Ministry of Earth Sciences.

Don’t confuse with MATSYA-6000 vs Samudrayaan: Samudrayaan is the mission name for the crewed dive project; MATSYA-6000 is the submersible vehicle built for it.

Don’t confuse with ISA vs NIOT: ISA is the international regulator under UNCLOS; NIOT is India's Chennai-based technology institute that builds the systems.

Science and technology: 57 Prelims questions since 2013; most test the concept behind the news, not the news itself. In Mains, 12 news-triggered questions.

No practice question for this one; the card may still help an answer. Why: Lasting S&T and ocean-resources topic; the release gives ISA Exploitation Code status. Worth a card; no question since facts are mainly progress updates.

Worth revising until Prelims 2027: most news questions come within two years of the event.

8

Scheme

BioE3 Policy

GS3 Science and TechnologyGS3 EconomyPrelims and Mains

Why in news
On 19 March 2026, at BIRAC's 14th Foundation Day, Dr Jitendra Singh said India's bioeconomy has grown to over USD 195 billion. The India Bioeconomy Report (IBER) 2026 and the BIRAC Impact Report were released.
What it is
BioE3 (Biotechnology for Economy, Environment and Employment) is a policy approved by the Union Cabinet in August 2024. It aims to build a resilient biomanufacturing ecosystem for bio-based products. It is run mainly by the Department of Biotechnology (DBT) and its public sector company BIRAC.
Policy name and approval
BioE3 stands for Biotechnology for Economy, Environment and Employment. The Union Cabinet approved it in August 2024.
Six thematic sectors
These are bio-based chemicals/enzymes, smart proteins and functional foods, precision biotherapeutics, climate-resilient agriculture, carbon capture and utilization, and futuristic marine and space research.
BioE3 Strain Resource Centre
It is set up at BRIC-NCCS, Pune. It gives access to indigenous microbial strains with freedom-to-operate, cutting reliance on imported strains.
Funding by DBT and BIRAC
DBT gives academia grant-in-aid. BIRAC supports start-ups and academia by grant-in-aid, and SMEs and industry through cofunding and royalty sharing.
State BioE3 Cells
BioE3 Cells have been notified in Assam, Sikkim and Himachal Pradesh as State coordination units.
Six thematic areas
The Policy covers biobased chemicals, enzymes and APIs; smart proteins and functional foods; precision biotherapeutics; climate resilient agriculture; carbon capture and utilization; and marine and space research.
Shared facilities (BioEnablers)
The Policy plans Bio-AI Hubs, Biofoundries and Biomanufacturing Hubs across the country in PPP mode, under the 'Moolankur' BioEnablers name.
Biomanufacturing Hubs
They give startups, academia and SMEs shared pilot-scale and pre-commercial-scale facilities, bridging lab research and full-scale manufacturing.
ISS microalgae experiment
Three indigenous microalgae (Chlorella sorokiniana-I, Parachlorella kessleri-I, Dysmorphococcus globosus-HI) were tested on the ISS for effects of microgravity, CO2 and O2 levels.
Cyanobacteria experiment
An Indian Spirulina isolate and a fast-growing Synechococcus strain were tested on nitrate and urea in microgravity, towards biological life support for space missions.
DBT-ICGEB Biofoundry
The New Delhi facility uses bacteria and yeast as microbial platforms and can scale production up to 20 litres.
2030 target
India aims for a USD 300 billion bioeconomy by 2030.
Startups
More than 11,800 biotech startups support the sector, which has more than doubled in size since 2020.
RDI Fund
The Research, Development and Innovation Fund has an outlay of Rs 1 lakh crore; BIRAC has a key role in backing biotech ventures under it.
BIRAC
BIRAC is the Biotechnology Industry Research Assistance Council, which helps connect research with industry and bring ideas to market.

Don’t confuse with DBT vs BIRAC: DBT is the government department for biotechnology. BIRAC is its public sector enterprise that funds start-ups, SMEs and industry.

Don’t confuse with Biofoundry vs Biomanufacturing Hub: A biofoundry gives early scale-up of proof-of-concept work using automation and the Design-Build-Test-Learn cycle. A hub offers larger shared pilot and pre-commercial-scale capacity.

Don’t confuse with Microalgae vs cyanobacteria: Chlorella and related species are eukaryotic microalgae. Spirulina and Synechococcus are cyanobacteria, which are prokaryotes.

Don’t confuse with BioE3 vs. BIRAC: BioE3 is a policy for the bioeconomy. BIRAC is an agency that funds and supports biotech startups and innovation.

Don’t confuse with IBER vs. BIRAC Impact Report: IBER measures the size of India's bioeconomy. The BIRAC Impact Report shows the outcomes of BIRAC's funding and incubation.

Schemes: 52 Prelims questions since 2013, 10 in Prelims 2026 alone. They test features, the period and who funds it. In Mains, 33 news-triggered questions, mostly GS3.

Test yourself

Worth revising until Prelims 2028: most news questions come within two years of the event.

9

Law and statutory body

Postal Ballot under Section 60(c), Representation of the People Act, 1951

GS2 Polity and GovernancePrelims and Mains

Why in news
On March 19, 2026, the Election Commission said elderly, PwD, essential-service and service voters can use postal ballots in the Assam, Kerala, Puducherry, Tamil Nadu and West Bengal Assembly elections, whose schedule was announced on March 15, 2026.
Legal basis
The facility for elderly and PwD electors is notified by the ECI under Section 60(c) of the RP Act, 1951.
Application route
Elderly and PwD electors apply on Form 12D to the Returning Officer through the BLO within 5 days of notification of election; polling teams collect votes at their homes.
Essential services
Electors on essential services on poll day apply through a nodal officer of their department. Fire, health, electricity, traffic, ambulance and aviation services are covered.
Media persons
Media persons authorised by the ECI for poll-day coverage are treated as absentee voters on essential services and can use postal ballot.
Service voters and ETPBS
Service voters receive postal ballots electronically through ETPBS once the list of contesting candidates is final, and do not bear postal costs.
Deadline
Postal ballots must reach the Returning Officers by 8:00 AM on the counting day, May 4, 2026.

Don’t confuse with Postal ballot vs proxy voting: Postal ballot is a ballot paper marked and returned by post or at a centre. Proxy voting lets a nominated person cast the vote for a classified service voter.

Don’t confuse with Postal ballot vs ETPBS: ETPBS sends the blank ballot electronically to service voters. The voter still prints, marks and posts the ballot back.

Laws, judgments and statutory bodies: 30 Prelims questions since 2013 (what the law says, who chairs, legal basis). In Mains, 44 news-triggered questions, most in GS2, asking for provisions and challenges.

No practice question for this one; the card may still help an answer. Why: Lasting electoral-law topic: postal ballot for 85+ voters, PwDs and essential-service voters. Procedural announcement for a state election cycle; card only.

Worth revising until Prelims 2027: most news questions come within two years of the event.

10

Environment

India's Non-Fossil Capacity and NDC Targets

GS3 Energy and climate changeGS3 Renewable energyPrelims and Mains

Why in news
On 19 March 2026, at the Bharat Electricity Summit in New Delhi, the Ministry of Power released the National Resource Adequacy Plan and a transmission plan for over 900 GW of non-fossil capacity by 2035-36. The Minister said India reached its NDC target of 50% non-fossil capacity nearly five years early.
What it is
India's NDC under the Paris Agreement sets a goal of 50% cumulative installed electric power capacity from non-fossil sources by 2030. It sits alongside the aim of 500 GW non-fossil capacity by 2030 and net zero by 2070. Non-fossil capacity covers solar, wind, hydro, biomass and nuclear.
NDC target met
The Minister said India achieved the NDC target of 50% cumulative non-fossil electric capacity nearly five years ahead of schedule.
Solar growth
Solar capacity has grown from 2.8 GW to over 143 GW, according to the Minister of State.
Peak demand
India met a peak demand of 250 GW in 2024-25 and says it is ready for 270 GW and beyond.
Capacity basis
The NDC target is about installed capacity, not electricity generated. Generation share of non-fossil sources is lower.
Milestone
Non-fossil sources made up 50.08% of installed capacity (242.78 GW of 484.82 GW) on 30 June 2025.
Target for 2030
The government aims at 500 GW of non-fossil capacity by 2030.
Nuclear goal
A target of 100 GW nuclear capacity by 2047 has been set.
Net zero year
India's net zero target year is 2070.
RE bidding
MNRE set a bidding trajectory of 50 GW per annum of RE power procurement bids from FY 2023-24 to FY 2027-28.
RCO
The Renewable Consumption Obligation applies to designated consumers under the Energy Conservation Act 2001 and carries penalties for non-compliance.

Don’t confuse with Capacity vs generation: 50% of installed capacity is not 50% of electricity generated. Solar and wind run at lower utilisation than coal, so their generation share is lower.

Don’t confuse with NDC vs net zero: The NDC targets are for 2030 and are filed under the Paris Agreement. Net zero by 2070 is a separate long-term goal.

Don’t confuse with NDC vs net zero target: The NDC is a 2030 pledge under the Paris Agreement, including 50% non-fossil capacity. Net zero by 2070 is a separate long-term goal.

Environment: Prelims tests bodies, programmes and the law behind them; Mains asks why plans fall short.

Test yourself

Worth revising until Prelims 2027: most news questions come within two years of the event.

11

Report or index

NITI Aayog Report on Sports Equipment Manufacturing Exports

GS3 IndustryPrelims and Mains

Why in news
On 19 March 2026, NITI Aayog released a report on realising the export potential of India's sports equipment manufacturing sector. It sets a roadmap to 2036 for raising exports.
What it is
This is a NITI Aayog policy report on India's sports equipment manufacturing sector. It assesses the sector's capabilities, global markets, and the policy steps needed to compete abroad. The sector is mostly small and micro enterprises, clustered in Jalandhar and Meerut.
Publisher and release
The report was released by NITI Aayog Vice Chairman Suman Bery. NITI Aayog is the Government of India's policy think tank.
India's export position
India exports about $275 million of sports equipment a year, about 0.5% of the global export market.
Industry structure
About 90% of production is by small and micro enterprises. Key clusters are Jalandhar (Punjab) and Meerut (Uttar Pradesh).
Cost disadvantage
Indian makers face a 15-20% cost disadvantage against China and Pakistan. Causes include high duties on carbon fibre, EVA foam and polyurethane, and high certification costs.
Recommendations
These include four new greenfield clusters in port-proximate states, modernising the Meerut and Jalandhar clusters, shared testing facilities and a 'Brand India' framework. The roadmap proposes about ₹7,500 crore of investment in 2027-2031.

Don’t confuse with Sports goods vs sports equipment: Sports goods include apparel, footwear, equipment and accessories (about $700 billion globally in 2024). Equipment alone is about $140 billion.

Reports and indices: 14 Prelims questions since 2013; they test who publishes a report and what it measures.

No practice question for this one; the card may still help an answer. Why: Report with target of USD 8.1 billion sports goods exports by 2036. Reports are only 14 Prelims questions, mostly on publisher; card only.

Worth revising until Prelims 2027: most news questions come within two years of the event.

Quick facts

  • India auctioned a record 200 mineral blocks in FY 2025-26 (123 Mining Lease, 77 Composite Licence); Gujarat led with 32.
  • A Rs 200-crore Banana Cluster at Jalgaon, Maharashtra has been approved, with subsidies under MIDH and the Agriculture Infrastructure Fund.

Source: PIB, 19 Mar

What we left out: 69 of 82 releases
  • Greetings and festival messages (7)
  • Same issue as another release (18)
  • Routine parliament replies (18)
  • Routine data updates (6)
  • Speeches without a decision (2)
  • Ceremonies and campaigns (8)
  • Leader phone calls (5)
  • Routine MoUs (1)
  • Briefings without a decision (1)
  • Workshops and webinars (2)
  • Visit schedules and bilateral meetings (1)

Practise the day’s news

Mains question of the day

15 marks · 250 words

The Government has approved RELIEF under the Export Promotion Mission, with an outlay of Rs 497 crore, to support exporters hit by West Asia shipping disruptions. Discuss the provisions of RELIEF and examine its significance and challenges in protecting Indian exporters, especially MSMEs, during geopolitical shocks.

From: Export Promotion Mission (EPM)

Write and get it marked

Keep reading

All days