UDAN (Ude Desh ka Aam Nagrik)

GS3 Infrastructure · AviationGS2 Centre-StatePrelims and Mains

In the news since 4 July 2026 · last on 20 October 2026

Why in news
On 20 October 2026, PIB published a backgrounder as UDAN completes ten years (launched 21 October 2016). It also describes the Modified UDAN scheme launched on 4 July 2026.
What it is
UDAN (Ude Desh ka Aam Nagrik) is the Centre's regional air connectivity scheme, begun in 2016. It links unserved and underserved airports by having airlines bid for routes. The Airports Authority of India implements it.
Launch
The Regional Connectivity Scheme, branded UDAN, was launched on 21 October 2016 under the National Civil Aviation Policy 2016.
First flight
The first UDAN flight ran from Shimla to Delhi in April 2017.
Modified UDAN outlay and period
The next phase runs ten years, FY 2026-27 to FY 2035-36, with a total outlay of Rs 28,840 crore.
Airline support
Rs 10,043 crore of VGF is for airlines over ten years. Support is for up to five years, tapering from the third year, and route exclusivity is limited to three years.
Centre-State MoUs
21 MoUs were signed between the Government, participating States/UTs and the AAI.
Implementing agency
The Airports Authority of India (AAI) is the implementing agency. The 21 MoUs were signed among the Ministry, the States/UTs and AAI.
Challenge Mode
States and UTs can nominate airstrips and helipads for development under the next phase through a dedicated portal.
Four pillars of Modified UDAN
Affordability for passengers, sustainability of operations, a transparent Challenge Mode framework, and promotion of indigenous manufacturing.
Route bidding
Airlines bid for identified UDAN routes, so routes and operators are chosen competitively.
Achievements so far
The Minister said UDAN has operationalised 687 routes and 95 aerodromes.
Targets of Modified UDAN
The MoS said Modified UDAN aims at 120 new destinations and 4 crore more passengers over the next ten years.
Outlay and period
Modified UDAN runs for ten years, FY 2026-27 to FY 2035-36, with an outlay of ₹28,840 crore.
VGF terms
Airlines get Viability Gap Funding for up to five years. Tapering starts from the third year. Route exclusivity is limited to three years.
RCS levy
UDAN is funded from within the sector by a small levy on selected domestic flights, described as a first-of-its-kind model.
Indigenous aircraft
The scheme proposes two HAL Dhruv helicopters for Pawan Hans and two HAL Dornier aircraft for Alliance Air.
Launch of Modified UDAN
The Prime Minister launched Modified UDAN on 4 July 2026 from Jodhpur Airport.
AOP condition for bidders
Airlines without an Air Operator Permit (AOP) cannot bid for routes. A failed bidder is barred from the re-bidding.
Track record
Since October 2016 UDAN has operationalised 669 routes and connected 95 airports, heliports and water aerodromes, with over 1.66 crore passengers.
Outlay and approval
The Union Cabinet approved the Modified UDAN Scheme on 25 March 2026, with about ₹29,000 crore over ten years.

Don’t confuse with UDAN vs Modified UDAN: UDAN (2016) funded VGF mainly for airlines on routes. Modified UDAN (2026) adds aerodrome capex, O&M support, helipads and indigenous aircraft purchase.

Don’t confuse with AAI vs DGCA: AAI builds and manages airports and implements UDAN; DGCA regulates safety and licensing.

Don’t confuse with UDAN vs Challenge Mode: UDAN is the overall scheme with airline route bidding. Challenge Mode is the new route for States/UTs to nominate airstrips and helipads for development.

Don’t confuse with VGF period vs exclusivity: VGF lasts up to five years, with tapering from year three. Route exclusivity is only three years.

Don’t confuse with Scheme period vs component period: The scheme runs ten years. Aerodrome and helipad outlays are over eight years, and VGF over ten.

Don’t confuse with RCS vs UDAN: The Regional Connectivity Scheme is the official name; UDAN is its brand name.

Don’t confuse with Served vs underserved airport: An unserved airport has no scheduled flights. An underserved one has few flights, below the departure, city-pair and passenger thresholds.

Don’t confuse with UDAN vs Viksit UDAN: Viksit UDAN is the name for the Modified UDAN Scheme, the next phase of the same scheme, not a new scheme.

Don’t confuse with Helipads vs aerodromes: The 200 figure is for modern helipads; 100 is for aerodromes from unserved airstrips.

Schemes: 52 Prelims questions since 2013, 10 in Prelims 2026 alone. They test features, the period and who funds it. In Mains, 33 news-triggered questions, mostly GS3.

Test yourself

Worth revising until Prelims 2028: most news questions come within two years of the event.

Each time it was in the news

  1. 20 October 2026

    On 20 October 2026, PIB published a backgrounder as UDAN completes ten years (launched 21 October 2016). It also describes the Modified UDAN scheme launched on 4 July 2026.

  2. 22 September 2026

    On 22 September 2026, the Civil Aviation Ministry signed 21 MoUs with States/UTs for the next phase of UDAN, launched a Challenge Mode Portal for Aerodrome Development and released the Scheme Document for the next route bidding round.

  3. 17 July 2026

    On 17 July 2026, PIB explained the Modified UDAN scheme, launched on 4 July 2026. It runs from FY 2026-27 to FY 2035-36 with an outlay of ₹28,840 crore.

  4. 16 July 2026

    On 16 July 2026, the Civil Aviation Ministry held a stakeholder workshop in New Delhi on the next phase of UDAN. The Minister explained the Modified UDAN scheme, launched on 4 July 2026, and the UDAN Scheme Document was released.

  5. 4 July 2026

    On 4 July 2026 PM Modi launched the next phase of UDAN, called Viksit UDAN or Modified UDAN, from Jodhpur. The Cabinet had approved it on 25 March 2026 with an outlay of about ₹29,000 crore over ten years.