Scheme

Multi-Lane Free Flow (MLFF) Tolling

GS3 InfrastructurePrelims and Mains

In the news since 11 April 2026 · last on 1 July 2026

Why in news
On 1 July 2026, NHAI announced the launch of Multi-Lane Free Flow (MLFF) tolling at Manoharpura Toll Plaza on the Delhi-Jaipur section of NH-48 in Rajasthan. Rajasthan's first MLFF site, Daulatpura, began on 19 June 2026.
What it is
Multi-Lane Free Flow (MLFF) is a barrier-less tolling system on National Highways. Vehicles pass toll points without stopping, and the fee is collected electronically. It combines number plate recognition cameras with FASTag-based Electronic Toll Collection.
Where launched
MLFF went live at Manoharpura Toll Plaza on the Delhi-Jaipur section of NH-48 in Rajasthan.
Rajasthan's first
Rajasthan's first MLFF system was rolled out at Daulatpura Toll Plaza on 19 June 2026. Shahjahanpur plaza is planned next.
Technology
The system links ANPR (Automatic Number Plate Recognition) with FASTag-based Electronic Toll Collection.
E-Notice rule
Users with low balance or an invalid FASTag get an E-Notice and must pay the normal fee within 72 hours.
Penalty
If not paid after 72 hours, the fee is charged at twice the normal rate for the vehicle category.
Payment channels
E-Notices can be paid through the designated Parivahan portal and the Rajmargyatra App.
Location
First MLFF toll is at Chorayasi Toll Plaza, Surat–Bharuch section of NH-48, Gujarat.
E-Notice
Users with low balance or an invalid FASTag get an E-Notice and must pay the normal fee within 72 hours.
Consequence of non-payment
Unpaid E-Notices may lead to FASTag blacklisting and restriction of other vehicle services through VAHAN.
Implementing agency
NHAI, under the Ministry of Road Transport and Highways, runs National Highway toll collection.
Where
The first MLFF system is at Chorayasi Toll Plaza on the Surat–Bharuch section of NH-48 in Gujarat.
Expected benefits
It is expected to cut travel time, decongest highways, save fuel, lower emissions and reduce human intervention in toll operations.
Ministry
It is run under the Ministry of Road Transport & Highways, which announced the launch.
Payment modes
Only FASTag or UPI are accepted for user fee payment at National Highway fee plazas.
Exempt areas
Tamil Nadu, Kerala, Assam, West Bengal and Puducherry are not covered yet because of the Model Code of Conduct during elections.
Nodal ministry
The Ministry of Road Transport & Highways issued the announcement; NHAI collects fees on National Highways.
MLFF technology
MLFF uses number plate recognition cameras with FASTag-based electronic toll collection, so vehicles need not stop.

Don’t confuse with MLFF vs FASTag-only plazas: FASTag plazas still have barriers and lanes where vehicles slow or stop. MLFF has no barriers and vehicles do not stop.

Don’t confuse with MLFF vs FASTag ETC: FASTag uses RFID at a plaza with barriers or lanes; MLFF is barrier-less and adds ANPR cameras so vehicles need not stop.

Don’t confuse with ANPR vs RFID: ANPR reads number plates through cameras; RFID reads the FASTag tag by radio.

Don’t confuse with MLFF vs FASTag: FASTag is the RFID tag and payment method. MLFF is the barrier-less toll system that uses FASTag along with number plate cameras.

Don’t confuse with FASTag vs MLFF: FASTag is an RFID-based prepaid tag for electronic payment at toll plazas. MLFF is a barrier-less system that uses it together with cameras.

Don’t confuse with FASTag vs UPI: FASTag is linked to the vehicle windscreen tag and its account. UPI is an instant interbank mobile payment system run by NPCI.

Schemes: 52 Prelims questions since 2013, 10 in Prelims 2026 alone. They test features, the period and who funds it. In Mains, 33 news-triggered questions, mostly GS3.

Test yourself

Worth revising until Prelims 2028: most news questions come within two years of the event.

Each time it was in the news

  1. 1 July 2026

    On 1 July 2026, NHAI announced the launch of Multi-Lane Free Flow (MLFF) tolling at Manoharpura Toll Plaza on the Delhi-Jaipur section of NH-48 in Rajasthan. Rajasthan's first MLFF site, Daulatpura, began on 19 June 2026.

  2. 2 May 2026

    On 2 May 2026 NHAI announced it had launched India's first Multi-Lane Free Flow (MLFF) tolling system at Chorayasi Toll Plaza on the Surat–Bharuch section of NH-48 in Gujarat. About 41,500 vehicles crossed it on day one.

  3. 1 May 2026

    On 1 May 2026, Union Road Transport Minister Nitin Gadkari announced the launch of India's first Multi-Lane Free Flow (MLFF) barrier-less tolling system at Chorayasi Toll Plaza on NH-48 in Gujarat.

  4. 11 April 2026

    From 10 April 2026, National Highway fee plazas accept user fees only through FASTag or UPI, as announced on 11 April 2026. Tamil Nadu, Kerala, Assam, West Bengal and Puducherry are exempt for now because the Model Code of Conduct is in force.