Science and technology

KAVACH Automatic Train Protection

GS3 Infrastructure / RailwaysPrelims and Mains

In the news since 23 September 2026

Why in news
On 23 September 2026, the Ministry of Railways announced that KAVACH Version 4.0 was commissioned for the first time, on 108 route km of the Malkajgiri-Kamareddi section of South Central Railway.
What it is
KAVACH is India's indigenously developed Automatic Train Protection (ATP) system for Indian Railways. It helps the loco pilot keep to speed limits and applies brakes automatically if the pilot fails to act. It works through trackside RFID tags, station units, towers and on-board units in locomotives.
Where 4.0 was commissioned
First commissioning of Version 4.0 is on 108 route km of the Malkajgiri-Kamareddi section, Hyderabad Division, South Central Railway.
New features in 4.0
Better location accuracy, better signal aspect information in bigger yards, station-to-station OFC interface, and direct interface with Electronic Interlocking.
Safety certification
KAVACH needs the highest safety certification, SIL-4.
What it does
It helps prevent Signal Passing at Danger (SPAD), controls speed and automatically applies brakes if the Loco Pilot fails to do so.
Components
Station KAVACH, RFID tags on track, telecom towers, optical fibre cable along track, and Loco KAVACH on locomotives.
Earlier version on SCR
Version 3.2 had been deployed over 1,465 route km on South Central Railway.

Don’t confuse with SPAD vs collision: SPAD means a train passing a red signal without authority. It is a main cause of collisions but is not itself a collision.

Don’t confuse with ATP vs Electronic Interlocking: ATP (KAVACH) supervises train speed and braking. Electronic Interlocking controls signals and points to set safe routes.

Science and technology: 57 Prelims questions since 2013; most test the concept behind the news, not the news itself. In Mains, 12 news-triggered questions.

Test yourself

Worth revising until Prelims 2028: most news questions come within two years of the event.

Each time it was in the news

  1. 23 September 2026

    On 23 September 2026, the Ministry of Railways announced that KAVACH Version 4.0 was commissioned for the first time, on 108 route km of the Malkajgiri-Kamareddi section of South Central Railway.