2001 General Studies, all questions

UPSC Prelims 2001 · General Studies

Question 141: Basic Numeracy

A conveyer belt delivers baggage at the rate of 3 tons in 5 minutes, and a second conveyer belt delivers baggage at the rate of 1 ton in 2 minutes. How much time will it take to get 33 tons of baggage delivered using both the conveyer belts?

a25 minutes and 30 seconds
b30 minutes
c35 minutes
d40 minutes and 45 seconds

AnswerThe answer is (b).

The first belt delivers 3 tons in 5 minutes, i.e. 0.6 ton a minute. The second delivers 1 ton in 2 minutes, i.e. 0.5 ton a minute. Together they deliver 1.1 tons a minute, so 33 tons take 33 / 1.1 = 30 minutes. Remember to add rates, not times, when machines work together.

Why each option is right or wrong
  • (a) 25.5 minutes would deliver only 28 tons.
  • (b) Right: 30 minutes.
  • (c) 35 minutes would deliver 38.5 tons.
  • (d) 40.75 minutes would deliver about 45 tons.

Explanation: written by UPSC Grade, not by UPSC.

Source: UPSC, Civil Services (Preliminary) Examination 2001, General Studies. UPSC's own paper isn't online; the words are from a published compilation. The paper on upsc.gov.in.