Science and technology

Nuclear Energy Mission, Small Modular Reactors and SHANTI Act

GS3 Energy - Nuclear PowerGS2 LawsPrelims and Mains

In the news since 22 July 2026 · last on 28 August 2026

Why in news
On 28 August 2026, PIB published an explainer on India's nuclear energy programme. It covers capacity, safety, waste, emergency planning and non-power uses of atomic energy.
What it is
India's nuclear programme is run by the Department of Atomic Energy, with NPCIL operating power reactors and AERB as the regulator. Its power plants mostly use indigenous Pressurised Heavy Water Reactors. The Nuclear Energy Mission for Viksit Bharat and the SHANTI Act, 2025 set the present policy and legal framework for expansion.
Installed base
India operates 24 power reactors at seven sites with 8.78 GW capacity. Nine more are under construction.
Mission target
The Nuclear Energy Mission aims for 100 GW of nuclear capacity by 2047.
SMR funding
Budget 2025-26 set aside ₹20,000 crore for indigenous Small Modular Reactors.
Nuclear process heat hydrogen
India inaugurated the world's first hydrogen production facility using nuclear process heat at Kalpakkam in 2026.
Boron-11 facility
India's first electronics-grade Boron-11 enrichment facility is at Talcher, for semiconductor use.
BARC designs
BARC is developing BSMR-200 (220 MWe), SMR-55 (55 MWe) and an HTGCR of up to 5 MWth for hydrogen production.
Funding
Rs 20,000 crore is allocated under NEM for SMR research, development and deployment.
SHANTI Act and AERB
The Act gives AERB statutory status and sets graded liability based on facility type and reactor power.
Construction time
Demonstration SMRs are estimated to take 60 to 72 months from financial approval.
Target
Nuclear power capacity of 100 GW by 2047, with a large share from indigenous PHWR plants.
FBR expansion
Pre-project activities of 2 x 500 MW FBR 1 & 2 at Kalpakkam, Tamil Nadu are approved.
Mahi Banswara project
Implemented by ASHVINI, a joint venture of NPCIL and NTPC, in Rajasthan.
SHANTI Act rules
States, industries and research institutions can collaborate with the Government once rules are framed.
Fast breeder concept
A fast breeder reactor uses fast neutrons and produces more fissile material than it consumes; it is the second stage of India's three-stage programme.
BSMR-200 and SMR-55
Both are PWR-based; the Atomic Energy Commission approved Tarapur, Maharashtra as the site for each.
SMR goal
At least five indigenous SMRs to be developed and operationalised by 2033.
Sites
The Atomic Energy Commission approved Tarapur, Maharashtra as the site for BSMR-200; the HTGCR is proposed at BARC, Vizag.
AERB under SHANTI Act
The Act gives the regulator statutory status so it can work independently.

Don’t confuse with AERB vs DAE: DAE runs the programme and leads emergency technical response. AERB is the regulator that sets dose limits and approves emergency plans.

Don’t confuse with Occupational vs public dose limit: Workers: average 20 mSv a year over five years. Public: 1 mSv a year.

Don’t confuse with MWe vs MWth: MWe is electrical output; MWth is thermal output. The HTGCR is rated in MWth because it supplies heat for hydrogen.

Don’t confuse with AERB vs AEC: AERB is the nuclear safety regulator; the Atomic Energy Commission sets policy and approves projects, such as sites for the SMRs.

Don’t confuse with PHWR vs FBR: PHWRs use natural uranium and heavy water (stage one); FBRs use plutonium-based fuel and fast neutrons (stage two).

Don’t confuse with BSMR-200 vs SMR-55: Both are BARC-designed PWR-based SMRs, rated 220 MWe and 55 MWe, and both sited at Tarapur.

Don’t confuse with PHWR vs PWR/LWR: PHWR uses heavy water as moderator and coolant; PWR is a light water reactor. India's fleet is mostly PHWR, while BSMR-200 and SMR-55 are PWR designs.

Science and technology: 57 Prelims questions since 2013; most test the concept behind the news, not the news itself. In Mains, 12 news-triggered questions.

Test yourself

Worth revising until Prelims 2028: most news questions come within two years of the event.

Each time it was in the news

  1. 28 August 2026

    On 28 August 2026, PIB published an explainer on India's nuclear energy programme. It covers capacity, safety, waste, emergency planning and non-power uses of atomic energy.

  2. 5 August 2026

    On 5 August 2026, in a written Lok Sabha reply, Dr. Jitendra Singh gave the status of India's Small Modular Reactors under the Nuclear Energy Mission and the SHANTI Act, 2025.

  3. 29 July 2026

    On 29 July 2026, in a written Lok Sabha reply, the Atomic Energy minister set out progress on the Nuclear Energy Mission, including the 100 GW by 2047 target, SHANTI Act and PFBR criticality.

  4. 23 July 2026

    On 23 July 2026, the Minister replied in the Rajya Sabha on progress under the Nuclear Energy Mission, giving the 100 GW roadmap and the status of three BARC-designed small reactors.

  5. 22 July 2026

    On 22 July 2026, in a written Lok Sabha reply, the Department of Atomic Energy set out the Nuclear Energy Mission roadmap, the status of three BARC-designed small reactors, and the role of the SHANTI Act, 2025.