Economy

ALMM (Approved List of Models and Manufacturers) for Solar

GS3 Energy and industryPrelims and Mains

In the news since 18 March 2026

Why in news
On 18 March 2026 the Ministry of New and Renewable Energy extended the ALMM Order to solar ingots and wafers through a new List-III, effective 1 June 2028.
What it is
The Approved List of Models and Manufacturers (ALMM) is an MNRE framework, begun with the 2019 Order, that lists approved makers of solar equipment. Projects covered by it must buy only from listed makers. It is used to build domestic solar manufacturing and ensure quality.
New list
ALMM List-III covers ingots and wafers, with wafers the first item to be enlisted. It takes effect on 1 June 2028.
Threshold for initial list
The initial list is issued only when at least 3 independent units, not under common ownership or control, have a combined 15 GW capacity.
Ingot capacity condition
A wafer maker seeking enlistment must also have equivalent ingot capacity.
Legal coverage
ALMM applies to projects awarded by competitive bidding under Sec 63 of the Electricity Act, 2003, and to net-metering and open-access projects.

Don’t confuse with ALMM vs DCR: ALMM lists approved makers. DCR requires use of domestically made components under specific schemes. The two operate side by side.

Don’t confuse with Ingot vs wafer vs cell: Ingots are sliced into wafers, wafers become cells, and cells are assembled into modules.

Economy terms and data: 42 Prelims questions since 2013, rising in recent years; they test what a term or instrument means. In Mains, 12 news-triggered questions.

Test yourself

Worth revising until Prelims 2027: most news questions come within two years of the event.

Each time it was in the news

  1. 18 March 2026

    On 18 March 2026 the Ministry of New and Renewable Energy extended the ALMM Order to solar ingots and wafers through a new List-III, effective 1 June 2028.